It was
Moved by Councillor Bose
Seconded by Councillor Hepner
That:
1.
Council file Rezoning Bylaw No. 19649 that received Third Reading at the
September 17, 2018, Regular Council – Public Hearing meeting.
2.
Council file Development Variance Permit No. 7917-0116-00.
3.
Council endorse the Public Notification to proceed for Bylaw No. 21138 to
rezone the subject site from "One-Acre Residential Zone (RA)" to
"Multiple Residential 30 Zone (RM-30)".
4.
Council authorize staff to draft an amended Development Permit
No. 7917-0116-00 generally in accordance with the attached updated
drawings (Appendix I), and the Ecosystem Development Plan.
5.
Council approve Development Variance Permit No. 7917-0116-01, varying
the following, to proceed to Public Notification:
(a)
to reduce the minimum north yard setback of the RM-30 Zone from
4.5 metres to 4.0 metres to the upper storey projections for
buildings 1 and 2;
(b)
to reduce the minimum north yard setback of the RM-30 Zone from
6.0 metres to 3.0 metres for buildings 10, 13 and 14;
(c)
to reduce the minimum east yard setback of the RM-30 Zone from
6.0 metres to 5.5 metres to the principal building face and
5.0 metres to the upper storey projections for buildings 2 and 10;
(d)
to reduce the minimum east yard setback of the RM-30 Zone from
6.0 metres to 4.5 metres to the principal building face and
4.0 metres to the upper storey projections for buildings 3, 4 and 11;
(e)
to reduce the minimum south yard setback of the RM-30 Zone from
6.0 metres to 4.3 metres for building 4;
Regular Council - Land Use Minutes
January 15, 2024
Page 13
(f)
to reduce the minimum south yard setback of the RM-30 Zone from
6.0 metres to 4.5 metres to the principal building face and
4.2 metres to the upper storey projections for buildings 11 and 12;
(g)
to reduce the minimum west yard setback of the RM-30 Zone from
6.0 metres to 4.1 metres for building 6;
(h)
to reduce the minimum west yard setback of the RM-30 Zone from
6.0 metres to 3.0 metres to the principal building face and
2.5 metres to the upper storey projections for building 12;
(i)
to reduce the minimum west yard setback of the RM-30 Zone from
6.0 metres to 5.0 metres to the principal building face and
4.4 metres to the upper storey projections for building 13;
(j)
to vary the Zoning By-law to increase the number of risers permitted
within the setback area from 3 to 5 for Units 1-9 and 51-56;
(k)
to permit visitor parking stalls 8 and 9 to be located within the west
yard setback;
(l)
to increase the maximum percentage of back-to-back townhouse
units from 20% to 30%; and
(m)
to reduce the outdoor amenity space requirement for back-to-back
ground-oriented dwelling units from 6.0 square metres to
3.0 square metres per dwelling unit.
6.
Council instruct staff to resolve the following issues prior to final adoption:
(a)
ensure that all engineering requirements and issues including
restrictive covenants, dedications, and rights-of-way where necessary,
are addressed to the satisfaction of the General Manager, Engineering;
(b)
submission of a subdivision layout to the satisfaction of the
Approving Officer;
(c)
submission of a finalized tree survey and a statement regarding tree
preservation to the satisfaction of the City Landscape Architect;
(d)
submission of a finalized landscaping plan and landscaping cost
estimate to the specifications and satisfaction of the Planning and
Development Department;
(e)
resolution of all urban design issues to the satisfaction of the
Planning and Development Department;
(f)
demolition of existing buildings and structures to the satisfaction of
the Planning and Development Department;
Regular Council - Land Use Minutes
January 15, 2024
Page 14
(g)
final acceptance from FortisBC;
(h)
registration of an easement for public access over the strata drive
aisle in the FortisBC right-of-way for a future green way;
(i)
registration of a Section 219 Restrictive Covenant required
increased rear yard setbacks for Buildings 5 and 6;
(j)
registration of a Section 219 Restrictive Covenant to adequately
address the City’s needs with respect to public art, to the
satisfaction of the General Manager, Parks, Recreation and Culture
and with respect to the City’s Affordable Housing Strategy and
Tier 1 Capital Project CACs, to the satisfaction of the
General Manager, Planning & Development Services;
(k)
finalization of an Ecosystem Development Plan to the satisfaction
of City staff;
(l)
the applicant satisfy the deficiency in tree replacement on the site, to
the satisfaction of the Planning and Development Department; and
(m)
the applicant convey riparian areas and Biodiversity Conservation
Strategy areas to the City as a lot. The City is to acquire the remaining
undeveloped areas of the site for parkland in accordance with the
West Clayton NCP.
7.
Council pass a resolution to amend the West Clayton Neighbourhood
Concept Plan (NCP) to re-align the Biodiversity Conservation Strategy
Green Infrastructure Network and the road network, in accordance with
Appendix VI, when the project is considered for final adoption.
RES.R24-12
Carried
R24-14 由 Bains 提议、Kooner 附议并通过:拟让 Surety Bond 可用于服务工程协议 7821-0090-00,并进入公众通知。
这条动议未明确记名个人票;不从“通过”或在场名单推算赞成。
官方英文动议与结果
It was
Moved by Councillor Bains
Seconded by Councillor Kooner
That Council approve Development Variance
Permit No. 7921-0090-00, to vary the definition of "Bond" in the Surrey Subdivision
and Development Bylaw, 1986, No. 8830, as amended, to include the use of Surety
Bond for Servicing Agreement No. 7821-0090-00, to proceed to Public Notification.
RES.R24-14
Carried
It was
Moved by Councillor Kooner
Seconded by Councillor Stutt
That:
1.
Council approve Development Variance Permit No. 7920-0162-02, varying
the following, to proceed to Public Notification:
(a)
to vary the Zoning Bylaw to increase the maximum percentage of
back-to-back townhouse units permitted within the
"Multiple Residential 30 Zone (RM-30)" from 20% to 27%; and
(b)
to vary the minimum required outdoor amenity space for the back-to-back
townhouse units from 6.0 square metres to 3.0 square metres, per unit.
2.
Council instruct staff to resolve the following issues prior to final approval:
(a)
all conditions of approval outlined in the Additional Planning Comments
Report No. 7920-0162-02 dated October 30, 2023, the Additional Planning
Comments Report No. 7920-0162-01 dated May 15, 2023, and the Initial
Planning Report No. 7920-0162-00 dated April 17, 2023 (Appendix II).
RES.R24-15
Carried
It was
Moved by Councillor Bains
Seconded by Councillor Kooner
That:
1.
Council approve Development Variance Permit No. 7920-0159-01, varying the
following, to proceed to Public Notification:
(a)
to vary the Zoning Bylaw to increase the maximum percentage of
back-to-back townhouse units permitted within the "Multiple
Residential 30 Zone (RM-30)" from 20% to 35.5%.
2.
Council instruct staff to resolve the following issues prior to final approval:
(a)
all conditions of approval outlined in the Additional Planning Comments
Report No. 7920-0159-01, dated October 30, 2023.
RES.R24-16
Carried
It was
Moved by Councillor Bains
Seconded by Councillor Sutt
That Council authorize the issuance of
Development Variance Permit No. 7920-0241-00.
RES.R24-33
Carried
It was
Moved by Councillor Kooner
Seconded by Councillor Stutt
That Council authorize the issuance of
Development Variance Permit No. 7923-0202-00.
RES.R24-34
Carried
It was
Moved by Councillor Hepner
Seconded by Councillor Stutt
That Council authorize the issuance of
Temporary Use Permit No. 7923-0264-00.
RES.R24-35
Carried
It was
Moved by Councillor Stutt
Seconded by Councillor Hepner
That Council close Application
No. 7918-0163-00 and file Bylaw No. 20274.
RES.R24-36
Carried
It was
Moved by Councillor Hepner
Seconded by Councillor Bose
That:
1.
Council authorize staff to draft Development Permit No. 7922-0170-00
generally in accordance with the attached drawings (Appendix I), and the
finalized Ecosystem Development Plan and Geotechnical Report.
2.
Council approve Development Variance Permit No. 7922-0170-00, to reduce the
minimum setback distance from top of bank of a Class A (red-coded)
channelized stream from 25 metres to 15 metres, on the north side of the stream
(Manson Canal), to proceed to Public Notification.
3.
Council instruct staff to resolve the following issues prior to final approval:
(a)
ensure that all engineering requirements and issues including
restrictive covenants, dedications, and rights-of-way where necessary,
are addressed to the satisfaction of the General Manager, Engineering;
(b)
input from the Ministry of Transportation & Infrastructure;
(c)
resolution of all urban design issues to the satisfaction of the
Planning and Development Department;
(d)
submission of a finalized landscaping plan and landscaping cost
estimate to the specifications and satisfaction of the Planning and
Development Department;
(e)
submission of a finalized tree survey and a statement regarding tree
preservation to the satisfaction of the City Landscape Architect;
(f)
the applicant satisfy the deficiency in tree replacement on the site,
to the satisfaction of the Planning and Development Department;
(g)
submission of a finalized Ecosystem Development Plan and Impact
Mitigation Plan to the satisfaction of City staff;
(h)
the applicant satisfy the requirements for a P-15 agreement;
(i)
submission of a finalized Geotechnical Report to the satisfaction of
City staff;
(j)
demolition of existing buildings and structures, and removal of any
unauthorized retaining walls remaining within City of Surrey’s
drainage statutory right-of-way (BB752745) to the satisfaction of the
Planning and Development Department;
(k)
the applicant to verify that the existing statutory right-of-way
BB752745, registered on title in favour of the City of Surrey, meets
current City standards including for drainage access; and
Regular Council - Land Use Minutes
January 15, 2024
Page 5
(l)
registration of a Section 219 Restrictive Covenant to restrict the
maximum amount of mezzanine space permitted on-site given the
parking allocation.
4.
Council pass a resolution to amend the South Westminster Neighbourhood
Concept Plan (NCP) to partially redesignate the land from "Parks and Open
Spaces" to "Highway Commercial" when the project is considered for final
adoption (Appendix IV).
RES.R24-6
Carried
It was
Moved by Councillor Bains
Seconded by Councillor Kooner
That:
1.
Council endorse the Public Notification to proceed for Bylaw No. 21136
rezone the subject site from "General Agriculture Zone (A-1)" to
"Comprehensive Development Zone (CD)".
2.
Council authorize staff to draft Development Permit No. 7918-0138-00
generally in accordance with the attached drawings (Appendix I), and the
Ecosystem Development Plan and Geotechnical Report.
3.
Council instruct staff to resolve the following issues prior to final adoption:
(a)
ensure that all engineering requirements and issues including
restrictive covenants, dedications, and rights-of-way where necessary,
are addressed to the satisfaction of the General Manager, Engineering;
(b)
submission of a road dedication plan to the satisfaction of the
Approving Officer;
(c)
resolution of all urban design issues to the satisfaction of the
Planning and Development Department;
(d)
submission of a finalized landscaping plan and landscaping cost
estimate to the specifications and satisfaction of the Planning and
Development Department;
Regular Council - Land Use Minutes
January 15, 2024
Page 6
(e)
submission of a finalized tree survey and a statement regarding tree
preservation to the satisfaction of the City Landscape Architect;
(f)
the applicant satisfy the deficiency in tree replacement on the site,
to the satisfaction of the Planning and Development Department;
(g)
submission of a finalized Ecosystem Development Plan to the
satisfaction of City staff;
(h)
conveyance of Biodiversity Conservation Strategy areas to the City;
(i)
submission of a finalized Geotechnical Report to the satisfaction of
City staff;
(j)
the applicant provide a density bonus amenity contribution
consistent with the Tier 2 Capital Projects CACs in support of the
requested increased density, to the satisfaction of the
General Manager, Planning and Development Department;
(k)
provision of cash-in-lieu contribution to satisfy the indoor amenity
space requirement of the RM-30 Zone, at the rate in effect at the
time of Final Adoption;
(l)
demolition of existing buildings and structures to the satisfaction of
the Planning and Development Department;
(m)
registration of a Section 219 Restrictive Covenant to adequately
address the City’s needs with respect to public art, to the
satisfaction of the General Manager, Parks, Recreation and Culture
and with respect to the City’s Affordable Housing Strategy and
Tier 1 Capital Project CACs, to the satisfaction of the
General Manager, Planning & Development Services;
(n)
registration of a Section 219 Restrictive Covenant that requires the
owner to develop the site in accordance with the conditions in the
geotechnical report; and
(o)
registration of a Section 219 Restrictive Covenant advising future
homeowners of the potential farm operations of the adjacent
agricultural lands.
4.
Council pass a resolution to amend the West Clayton Neighbourhood
Concept Plan (NCP) to redesignate the land from "Low Density Cluster" to
"Medium Density Cluster" when the project is considered for final adoption.
RES.R24-7
Carried
It was
Moved by Councillor Bains
Seconded by Councillor Kooner
That:
1.
Council authorize staff to draft Development Permit No. 7922-0342-00
generally in accordance with the attached drawings (Appendix I), and the
finalized Ecosystem Development Plan and Geotechnical Report.
2.
Council approve Development Variance Permit No. 7922-0342-00, varying
the following, to proceed to Public Notification:
(a)
to vary the minimum west side yard setback of the IL Zone from
7.5 metres or 0.0 metre to 1.5 metres.
3.
Council instruct staff to resolve the following issues prior to final approval:
(a)
ensure that all engineering requirements and issues including
restrictive covenants, dedications, and rights-of-way where necessary,
are addressed to the satisfaction of the General Manager, Engineering;
(b)
resolution of all urban design issues to the satisfaction of the
Planning and Development Department;
(c)
submission of a finalized landscaping plan and landscaping cost
estimate to the specifications and satisfaction of the Planning and
Development Department;
(d)
submission of a finalized tree survey and a statement regarding tree
preservation to the satisfaction of the City Landscape Architect;
(e)
submission of a finalized Ecosystem Development Plan and Impact
Mitigation Plan to the satisfaction of City staff;
(f)
registration of a combined Statutory Right-of-Way and Section 219
Restrictive Covenant as per the "minimum safeguarding" requirements
of the Sensitive Ecosystems Development Permit Area guidelines; and
(g)
submission of a finalized Geotechnical Report to the satisfaction of
City staff.
RES.R24-8
Carried
It was
Moved by Councillor Hepner
Seconded by Councillor Bains
That:
1.
Council file Development Permit No. 7915-0316-00.
2.
Council authorize staff to draft Development Permit No. 7922-0376-00
generally in accordance with the attached drawings (Appendix I), the
finalized Ecosystem Development Plan and Geotechnical report.
3.
Council approve Development Variance Permit No. 7922-0376-00, varying
the following, to proceed to Public Notification:
(a)
to reduce the minimum south lot line setback from 1.5 metres to
0.3 metres;
(b)
to reduce the minimum drive aisle width for on-site parking spaces
1-24 from 7.0 metres to 6.9 metres and to 0.0 metres for parking
spaces 25-28;
(c)
to permit a free-standing sign within a yard that abuts a highway
where the business to which the sign pertains is located in a
building whose setback is adjacent to that highway is less than
5.0 metres; and
(d)
to reduce the minimum setback for a Class A (red-coded) stream
from 30.0 metres to a minimum streamside setback of 12.94 metres.
4.
Council instruct staff to resolve the following issues prior to final approval:
(a)
ensure that all engineering requirements and issues including
restrictive covenants, dedications, and rights-of-way where necessary,
are addressed to the satisfaction of the General Manager, Engineering;
(b)
resolution of all urban design issues to the satisfaction of the
Planning and Development Department;
(c)
submission of a finalized landscaping plan and landscaping cost
estimate to the specifications and satisfaction of the Planning and
Development Department;
Regular Council - Land Use Minutes
January 15, 2024
Page 11
(d)
submission of a finalized tree survey and a statement regarding tree
preservation to the satisfaction of the City Landscape Architect;
(e)
the applicant satisfy the deficiency in tree replacement on the site,
to the satisfaction of the Planning and Development Department;
(f)
submission and acceptance of the Riparian Areas Protection
Regulation assessment from the Ministry of Environment and
Climate Change;
(g)
submission of a finalized Ecosystem Development Plan and Impact
Mitigation Plan to the satisfaction of City staff;
(h)
entering into a P-15 agreement with the City’s Parks Department for
maintenance of replanting in the conveyed riparian areas; and
(i)
submission of a finalized, peer reviewed, Geotechnical Report to
the satisfaction of City staff and registration of a Section 219
Restrictive Covenant to adequately address requirements identified
in the Geotechnical Report.
RES.R24-10
Carried