MetroVote 简体中文
公开试运行资料持续补充 · 名单日期见各选举页查看范围 ↗
SURREY · 正式动议

12090 104 Avenue 工业建筑/申请 7922-0170-00 · 起草开发许可并通知开发差异许可

查看同一事项的跨会议时间线:12090 104 Avenue 工业建筑/申请 7922-0170-00 →
2024-01-15RES.R24-6
起草开发许可并通知开发差异许可 →
该条动议通过

提议:Councillor Hepner;附议:Councillor Bose。这是程序角色,不代表个人投票。

R24-6:Hepner 提议、Bose 附议;起草开发许可并通知开发差异许可,动议通过。

这条动议未明确记名个人票;不从“通过”或在场名单推算赞成。

官方英文动议与结果
It was Moved by Councillor Hepner Seconded by Councillor Bose That: 1. Council authorize staff to draft Development Permit No. 7922-0170-00 generally in accordance with the attached drawings (Appendix I), and the finalized Ecosystem Development Plan and Geotechnical Report. 2. Council approve Development Variance Permit No. 7922-0170-00, to reduce the minimum setback distance from top of bank of a Class A (red-coded) channelized stream from 25 metres to 15 metres, on the north side of the stream (Manson Canal), to proceed to Public Notification. 3. Council instruct staff to resolve the following issues prior to final approval: (a) ensure that all engineering requirements and issues including restrictive covenants, dedications, and rights-of-way where necessary, are addressed to the satisfaction of the General Manager, Engineering; (b) input from the Ministry of Transportation & Infrastructure; (c) resolution of all urban design issues to the satisfaction of the Planning and Development Department; (d) submission of a finalized landscaping plan and landscaping cost estimate to the specifications and satisfaction of the Planning and Development Department; (e) submission of a finalized tree survey and a statement regarding tree preservation to the satisfaction of the City Landscape Architect; (f) the applicant satisfy the deficiency in tree replacement on the site, to the satisfaction of the Planning and Development Department; (g) submission of a finalized Ecosystem Development Plan and Impact Mitigation Plan to the satisfaction of City staff; (h) the applicant satisfy the requirements for a P-15 agreement; (i) submission of a finalized Geotechnical Report to the satisfaction of City staff; (j) demolition of existing buildings and structures, and removal of any unauthorized retaining walls remaining within City of Surrey’s drainage statutory right-of-way (BB752745) to the satisfaction of the Planning and Development Department; (k) the applicant to verify that the existing statutory right-of-way BB752745, registered on title in favour of the City of Surrey, meets current City standards including for drainage access; and Regular Council - Land Use Minutes January 15, 2024 Page 5 (l) registration of a Section 219 Restrictive Covenant to restrict the maximum amount of mezzanine space permitted on-site given the parking allocation. 4. Council pass a resolution to amend the South Westminster Neighbourhood Concept Plan (NCP) to partially redesignate the land from "Parks and Open Spaces" to "Highway Commercial" when the project is considered for final adoption (Appendix IV). RES.R24-6 Carried

官方会议记录中的程序和结果,不等同于个人政策立场。

核验版本与依据

修订 b6de6cc6-05d7-4ed8-abed-633ddda80089

程序解释规则:surrey-explicit-procedure-v1

Surrey planning report 7922-0170-00 · PDF 第 6 页

Surrey planning report 7922-0170-00 · PDF 第 1 页

Surrey 2024-01-15 市议会土地使用会议 · PDF 第 4–5 页

Surrey 2024-01-15 市议会土地使用会议 · PDF 第 1 页

同源 JSON ↗