2024-01-15RES.R24-8
拟稿开发许可,并让西侧退距偏差许可进入通知 →
提议:Councillor Bains;附议:Councillor Kooner。这是程序角色,不代表个人投票。
R24-8 由 Bains 提议、Kooner 附议并通过:拟稿开发许可,并让西侧退距偏差许可进入通知。
这条动议未明确记名个人票;不从“通过”或在场名单推算赞成。
官方英文动议与结果
It was
Moved by Councillor Bains
Seconded by Councillor Kooner
That:
1.
Council authorize staff to draft Development Permit No. 7922-0342-00
generally in accordance with the attached drawings (Appendix I), and the
finalized Ecosystem Development Plan and Geotechnical Report.
2.
Council approve Development Variance Permit No. 7922-0342-00, varying
the following, to proceed to Public Notification:
(a)
to vary the minimum west side yard setback of the IL Zone from
7.5 metres or 0.0 metre to 1.5 metres.
3.
Council instruct staff to resolve the following issues prior to final approval:
(a)
ensure that all engineering requirements and issues including
restrictive covenants, dedications, and rights-of-way where necessary,
are addressed to the satisfaction of the General Manager, Engineering;
(b)
resolution of all urban design issues to the satisfaction of the
Planning and Development Department;
(c)
submission of a finalized landscaping plan and landscaping cost
estimate to the specifications and satisfaction of the Planning and
Development Department;
(d)
submission of a finalized tree survey and a statement regarding tree
preservation to the satisfaction of the City Landscape Architect;
(e)
submission of a finalized Ecosystem Development Plan and Impact
Mitigation Plan to the satisfaction of City staff;
(f)
registration of a combined Statutory Right-of-Way and Section 219
Restrictive Covenant as per the "minimum safeguarding" requirements
of the Sensitive Ecosystems Development Permit Area guidelines; and
(g)
submission of a finalized Geotechnical Report to the satisfaction of
City staff.
RES.R24-8
Carried