MetroVote 简体中文
公开试运行资料持续补充 · 名单日期见各选举页查看范围 ↗
SURREY · 正式动议

7921-0197-00:启动邻里商业分区与许可草拟

查看同一事项的跨会议时间线:Application / Permit 7921-0197-00 — 1. Council file: a. Rezoning Bylaw No. 20986; b. Development Permit No. 7921-0197-00; c. Development Variance Permit No. 7921-0197-00; and c →
2023-07-10RES.R23-1295
7921-0197-00:启动邻里商业分区与许可草拟 →
该条动议通过

提议:Councillor Bose;附议:Councillor Kooner。这是程序角色,不代表个人投票。

2023-07-10,议会通过动议:引入 CG-2 加油站分区至 C-5 邻里商业分区的调整条例并安排公开听证,授权草拟开发许可 7921-0197-00。建筑退距、餐饮停车、屏障植栽和沿路景观带偏差进入公众通知;最终通过前仍须解决工程、道路移交、场地整治、设计、景观和树木等条件。

这条动议未明确记名个人票;不从“通过”或在场名单推算赞成。

官方英文动议与结果
It was Moved by Councillor Bose Seconded by Councillor Kooner That: 1. A Bylaw be introduced to rezone the subject site from "Combined Service Gasoline Station Zone (CG-2)" to "Neighbourhood Commercial Zone (C-5)" and a date be set for Public Hearing. 2. Council authorize staff to draft Development Permit No. 7921-0197-00 generally in accordance with the attached drawings (Appendix I). 3. Council approve Development Variance Permit No. 7921-0197-00, varying the following, to proceed to Public Notification: (a) to reduce the minimum front (north) yard setback of the C-5 Zone from 7.5 metres to 3.85 metres for the principal building; (b) to reduce the minimum side (west) yard setback of the C-5 Zone from 7.5 metres to 0 metres for the principal building; (c) to reduce the minimum side (east) yard setback of the C-5 Zone from 7.5 metres to 3.0 metres to the principal building face; (d) to reduce the minimum side (east) yard setback of the C-5 Zone from 7.5 metres to 1 metre for accessory structures; (e) to reduce the minimum number of off-street parking spaces for an eating establishment from 10 stalls per 100 square metres of floor area to 2.3 stalls per 100 square metres of floor area; Regular Council - Land Use Minutes July 10, 2023 Page 17 (f) to waive the requirement for continuous screen planting at least 1.5 m high in a strip at least 1.5 m wide and a solid decorative fence at least 1.5 m high along all lot lines separating the developed portion of the lot from any lot designated Residential in the OCP, except in those portions where a building abuts the lot line; and (g) to reduce the requirement for a continuous landscaping strip for the developed portions of the lot abutting a highway from 1.5 metres to 0.75 metres. 4. Council instruct staff to resolve the following issues prior to final adoption: (a) ensure that all engineering requirements and issues including restrictive covenants, dedications, and rights-of-way where necessary, are addressed to the satisfaction of the General Manager, Engineering; (b) submission of a road dedication plan to the satisfaction of the Approving Officer; (c) approval from the Ministry of Environment and Climate Change Strategy for site remediation; (d) resolution of all urban design issues to the satisfaction of the Planning and Development Department; (e) submission of a finalized landscaping plan and landscaping cost estimate to the specifications and satisfaction of the Planning and Development Department; (f) submission of a finalized tree survey and a statement regarding tree preservation to the satisfaction of the City Landscape Architect; and (g) the applicant satisfy the deficiency in tree replacement on the site, to the satisfaction of the Planning and Development Department. RES.R23-1295 Carried

官方会议记录中的程序和结果,不等同于个人政策立场。

核验版本与依据

修订 7d99747d-ec6c-4987-8ada-fc1e8478cbb3

程序解释规则:surrey-explicit-procedure-v1

Surrey 2023-07-10 市议会土地使用会议 · PDF 第 1 页

Surrey 2023-07-10 市议会土地使用会议 · PDF 第 16–17 页

同源 JSON ↗