R25/14-5 It was moved and seconded
That the preliminary design presented in the staff report titled “South Dike Upgrades Preliminary Design – 6080 Dyke Road to Gilbert Road”, dated June 18, 2025, from the Director, Engineering be approved for detailed design, to be brought forward for construction funding.