R25/14-5 It was moved and seconded
That the preliminary design presented in the staff report titled “South Dike Upgrades Preliminary Design – 6080 Dyke Road to Gilbert Road”, dated June 18, 2025, from the Director, Engineering be approved for detailed design, to be brought forward for construction funding.
R25/14-6 It was moved and seconded
That the preliminary design presented in the staff report titled “South Dike Upgrades Preliminary Design – 6080 Dyke Road to Gilbert Road”, dated June 18, 2025, from the Director, Engineering be referred back to staff for further consultation with residents and review of other available options and report back.