MetroVote 简体中文
公开试运行资料持续补充 · 名单日期见各选举页查看范围 ↗
SURREY · 正式动议

7923-0330-00:生态许可草拟与住宅尺度偏差通知

查看同一事项的跨会议时间线:Application / Permit 7923-0330-00 — 1. Council authorize staff to draft Development Permit No. 7923-0330-00 for Sensitive Ecosystems (Streamside and Green Infrastructure Areas) →
2025-05-12RES.R25-1330
7923-0330-00:生态许可草拟与住宅尺度偏差通知 →
该条动议通过

提议:Councillor Kooner;附议:Councillor Bains。这是程序角色,不代表个人投票。

2025-05-12,议会通过动议:授权草拟敏感生态系统及陡坡开发许可,并让开发偏差许可 7923-0330-00 进入公众通知:二楼最大面积由一楼的 80% 提至 94%、最小退让由 20% 降至 14%,住宅最小宽度由 7 米降至 6.7 米,东西侧院退距由 4.5 米降至 1.2 米。最终批准前仍须解决工程、生态、岩土及 Metro Vancouver 通行权范围内侵入的书面同意等条件;如主管认为必要,还可能要求赔偿责任协议。

这条动议未明确记名个人票;不从“通过”或在场名单推算赞成。

官方英文动议与结果
It was Moved by Councillor Kooner Seconded by Councillor Bains That: 1. Council authorize staff to draft Development Permit No. 7923-0330-00 for Sensitive Ecosystems (Streamside and Green Infrastructure Areas) and Hazard Lands (Steep Slope). 2. Council approve Development Variance Permit No. 7923-0330-00, varying the following requirements in the RA zone, to proceed to Public Notification: (a) to increase the maximum permitted floor area of the second storey for a principal building from 80% to 94% and decrease the minimum offset at the second storey from 20% to 14% of the area of the first storey; (b) to reduce the minimum building width for a single family dwelling from 7 metres to 6.7 metres; and (c) to reduce the minimum side yard setbacks for a single family dwelling from 4.5 metres to 1.2 metres for the east and west side lot lines. 3. Council instruct staff to resolve the following issues prior to final approval Regular Council - Land Use Minutes May 12, 2025 Page 13 (a) submission of a finalized tree survey and a statement regarding tree preservation to the satisfaction of the City Landscape Architect; (b) the applicant satisfy the deficiency in tree replacement on the site, to the satisfaction of the Planning and Development Department; (c) submission of a finalized Ecosystem Development Plan and Impact Mitigation Plan to the satisfaction of City staff; (d) submission of a finalized Geotechnical Report to the satisfaction of City staff; (e) written consent agreement from Metro Vancouver in regard to the proposed encroachment in their Right-of -Way required for sanitary purposes located in the front portion of the subject property; and (f) an indemnity agreement may be required if deemed necessary by the General Manager, of Planning and Development. RES.R25-1330 Carried

官方会议记录中的程序和结果,不等同于个人政策立场。

核验版本与依据

修订 3e3a8b6c-b490-4e10-ad32-61ccc615b6f8

程序解释规则:surrey-explicit-procedure-v1

Surrey 2025-05-12 市议会土地使用会议 · PDF 第 12–13 页

Surrey 2025-05-12 市议会土地使用会议 · PDF 第 1 页

同源 JSON ↗