It was
Moved by Councillor Kooner
Seconded by Councillor Hepner
That:
1.
Council rescind Third Reading of "Surrey Official Community Plan Bylaw,
2013, No. 18020, Amendment Bylaw, 2022, No. 20592", granted by
Resolution No. R22-553 at the March 28, 2022 Regular Council - Public
Hearing meeting, and set a date for Public Hearing.
Regular Council - Land Use Minutes
May 12, 2025
Page 9
2.
Council rescind Third Reading of "Surrey Comprehensive Development
Zone 44 (CD 44), Bylaw, 2022, No. 20593", granted by Resolution
No. R22-554 at the March 28, 2022 Regular Council - Public Hearing meeting.
3.
Council rescind Second Reading of Surrey Comprehensive Development
Zone 44 (CD 44), Bylaw, 2022, No. 20593, granted by Resolution No. R22-349
at the March 7, 2022 Regular Council - Land Use meeting.
4.
Council amend Surrey Comprehensive Development Zone 44 (CD 44),
Bylaw, 2022, No. 20593 as shown in Appendix VI.
5.
Council consider Second Reading of Surrey Comprehensive Development
Zone 44 (CD 44), Bylaw, 2022, No. 20593, as amended, and set a date for
Public Hearing.
6.
Council determine the opportunities for consultation with persons,
organizations and authorities that are considered to be affected by
the proposed amendment to the OCP, as described in the Report, to
be appropriate to meet the requirement of Section 475 of the
Local Government Act.
7.
Council authorize staff to draft Development Permit No. 7918-0088-00
generally in accordance with the attached drawings (Appendix I), the
finalized Ecosystem Development Plan, and finalized geotechnical report.
8.
Council instruct staff to resolve the following issues prior to final adoption:
(a)
ensure that all engineering requirements and issues including
restrictive covenants, dedications, and rights-of-way where
necessary, are addressed to the satisfaction of the General Manager,
Engineering;
(b)
submission of a subdivision layout to the satisfaction of the
Approving Officer;
(c)
approval from the Ministry of Transportation & Transit;
(d)
approval from Metro Vancouver (Greater Vancouver Sewerage and
Drainage District);
(e)
approval from BC Hydro;
(f)
resolution of all urban design issues to the satisfaction of the
Planning and Development Department;
(g)
submission of a finalized landscaping plan and landscaping cost
estimate to the specifications and satisfaction of the Planning and
Development Department;
Regular Council - Land Use Minutes
May 12, 2025
Page 10
(h)
submission of a finalized tree survey and a statement regarding tree
preservation to the satisfaction of the City Landscape Architect;
(i)
the applicant satisfy the deficiency in tree replacement on the site,
to the satisfaction of the Planning and Development Department;
(j)
submission of a finalized Ecosystem Development Plan to the
satisfaction of City staff;
(k)
voluntary conveyance of riparian areas and Biodiversity
Conservation Strategy areas to the City;
(l)
submission of a finalized Geotechnical Report to the satisfaction of
City staff;
(m)
the applicant provide a density bonus amenity contribution
consistent with the Tier 2 Capital Projects CACs in support of
the requested increased density, to the satisfaction of the
General Manager, Planning and Development Department;
(n)
provision of cash-in-lieu contribution to satisfy the indoor amenity
space requirement of the CD Zone, at the rate in effect at the time
of Final Adoption;
(o)
demolition of existing buildings and structures to the satisfaction of
the Planning and Development Department;
(p)
registration of a Section 219 Restrictive Covenant to adequately
address the City’s needs with respect to Public Art and the Tier 1
Community Amenity Contribution, to the satisfaction of the
General Manager, Planning and Development Department;
(q)
registration of a Section 219 Restrictive Covenant advising future
homeowners of farm practices in the area that may produce noise,
odour and dust;
(r)
registration of a Section 219 Restrictive Covenant to ensure that the
future construction is in accordance with the recommendations in
the submitted geotechnical report, and to indemnify the City from
any possible future damage resulting from development in the
hazard area for steep slopes; and
(s)
registration of an access easement through the development site to
provide access to the conveyed park lot.
Regular Council - Land Use Minutes
May 12, 2025
Page 11
8.
Council pass a resolution to introduce a new land use designation
"Residential (20 upa)" in the East Panorama Ridge Concept Plan; and to
amend the East Panorama Ridge Concept Plan to redesignate the site from
"Park" and "Business Park" to "Residential (20 upa)" for the townhouse site
and "Park" for the portion to be dedicated to the City for conservation
purposes, when the project is considered for final adoption.
RES.R25-1322
Carried
It was
Moved by Councillor Kooner
Seconded by Councillor Bose
That:
1.
a Bylaw be introduced to amend the OCP Figure 3: General Land Use
Designations, to redesignate the site from "Urban" to "Multiple Residential"
(Appendix VI), and a date be set for Public Hearing;
2.
Council determine the opportunities for consultation with persons,
organizations and authorities that are considered to be affected by
the proposed amendment to the OCP, as described in the Report, to
be appropriate to meet the requirement of Section 475 of the
Local Government Act.
3.
a Bylaw be introduced to rezone the subject site from "Acreage Residential
Zone (RA)" to the "Multiple Residential 70 Zone (RM-70)", and a date be
set for Public Hearing;
4.
Council authorize staff to draft Development Permit No. 7917-0198-00 for
Form and Character and Sensitive Ecosystems (Streamside Areas) generally
in accordance with the attached drawings (Appendix I), and the finalized
Ecosystem Development Plan.
5.
Council approve Development Variance Permit No. 7917-0198-00, varying
the following, to proceed to Public Notification:
(a)
to reduce the minimum front (north) yard setback of the RM-70 Zone
from 7.5 metres to 4.5 metres for the principal building, to 3.9 metres
for a roof overhang, and to 4.4 metres for a balcony;
(b)
to reduce the minimum rear (south) yard setback of the RM-70 Zone
from 7.5 metres to 5.0 metres for the principal building, to 3.1 metres
for a roof overhang, and to 3.7 metres for a balcony;
(c)
to reduce the minimum street side (east) yard setback of the
RM-70 Zone from 7.5 metres to 7.0 metres for the principal building,
to 5.1 metres for a roof overhang, and 6.0 metres for a balcony;
(d)
to increase the maximum lot coverage for all buildings and
structures of the RM-70 Zone from 33% to 39%;
(e)
to restrict the maximum height for a principal building in the
RM-70 Zone from 50 metres to 18.5 metres; and
(f)
to vary Part 4 Section 26. of the General Provisions to increase the
number of risers permitted to encroach into the setbacks to be greater
than three in the front yard (north) and street side yard (east).
Regular Council - Land Use Minutes
May 12, 2025
Page 16
6.
Council instruct staff to resolve the following issues prior to Final Adoption:
(a)
ensure that all engineering requirements and issues including
restrictive covenants, dedications, and rights-of-way where
necessary, are addressed to the satisfaction of the General Manager,
Engineering;
(b)
resolution of all urban design issues to the satisfaction of the
Planning and Development Department;
(c)
resolution of all environmental issues to the satisfaction of the
Planning and Development Department;
(d)
submission of a finalized landscaping plan and landscaping cost
estimate to the specifications and satisfaction of the Planning and
Development Department;
(e)
submission of a finalized Arborist report and tree survey and a
statement regarding tree preservation to the satisfaction of the City
Landscape Architect;
(f)
the applicant satisfy the deficiency in tree replacement on the site,
to the satisfaction of the Planning and Development Department;
(g)
submission of a finalized Ecosystem Development Plan and Impact
Mitigation Plan to the satisfaction of City staff;
(h)
voluntary conveyance of Isolated Wet Meadow and surrounding
lands to the City;
(i)
the applicant obtain authorization from neighbouring property owners
(18812 - 74 Avenue) for the removal of any off-site trees to accommodate
road upgrades associated with the proposed development;
(j)
the applicant provide a contribution consistent with the Tier 2
Capital Projects CACs in support of the requested increased
density, to the satisfaction of the General Manager, Planning and
Development;
(k)
provision of cash-in-lieu contribution to satisfy the indoor amenity
space requirement of the RM-70 Zone, at the rate in effect at the
time of Final Adoption;
(l)
demolition of existing buildings and structures to the satisfaction of
the Planning and Development Department; and
Regular Council - Land Use Minutes
May 12, 2025
Page 17
(m)
registration of a Section 219 Restrictive Covenant to adequately
address the City’s needs with respect to public art, to the
satisfaction of the General Manager, Parks, Recreation and Culture
and with respect to the City’s Affordable Housing Strategy and
Tier 1 Capital Project CACs, to the satisfaction of the
General Manager, Planning and Development.
7.
Council pass a resolution to amend the West Clayton Neighbourhood
Concept Plan (NCP) to redesignate the land from "High Density Cluster"
and "Green Density Transfer (Forest Preservation / Restoration)" to
"Townhouse/Apartment Flex (Type II)" and "Green Density Transfer
(Forest Preservation / Restoration)", when the project is considered for
Final Adoption (Appendix VII).
RES.R25-1332
Carried
2025-05-12,议会通过动议:授权草拟敏感生态系统及陡坡开发许可,并让开发偏差许可 7923-0330-00 进入公众通知:二楼最大面积由一楼的 80% 提至 94%、最小退让由 20% 降至 14%,住宅最小宽度由 7 米降至 6.7 米,东西侧院退距由 4.5 米降至 1.2 米。最终批准前仍须解决工程、生态、岩土及 Metro Vancouver 通行权范围内侵入的书面同意等条件;如主管认为必要,还可能要求赔偿责任协议。
这条动议未明确记名个人票;不从“通过”或在场名单推算赞成。
官方英文动议与结果
It was
Moved by Councillor Kooner
Seconded by Councillor Bains
That:
1.
Council authorize staff to draft Development Permit No. 7923-0330-00 for
Sensitive Ecosystems (Streamside and Green Infrastructure Areas) and
Hazard Lands (Steep Slope).
2.
Council approve Development Variance Permit No. 7923-0330-00, varying
the following requirements in the RA zone, to proceed to Public
Notification:
(a)
to increase the maximum permitted floor area of the second storey
for a principal building from 80% to 94% and decrease the
minimum offset at the second storey from 20% to 14% of the area of
the first storey;
(b)
to reduce the minimum building width for a single family dwelling
from 7 metres to 6.7 metres; and
(c)
to reduce the minimum side yard setbacks for a single family dwelling
from 4.5 metres to 1.2 metres for the east and west side lot lines.
3.
Council instruct staff to resolve the following issues prior to final approval
Regular Council - Land Use Minutes
May 12, 2025
Page 13
(a)
submission of a finalized tree survey and a statement regarding tree
preservation to the satisfaction of the City Landscape Architect;
(b)
the applicant satisfy the deficiency in tree replacement on the site,
to the satisfaction of the Planning and Development Department;
(c)
submission of a finalized Ecosystem Development Plan and Impact
Mitigation Plan to the satisfaction of City staff;
(d)
submission of a finalized Geotechnical Report to the satisfaction of
City staff;
(e)
written consent agreement from Metro Vancouver in regard to the
proposed encroachment in their Right-of -Way required for
sanitary purposes located in the front portion of the subject
property; and
(f)
an indemnity agreement may be required if deemed necessary by
the General Manager, of Planning and Development.
RES.R25-1330
Carried