SP23/3-1 It was moved and seconded
That the staff report titled “Steveston Highway Multi-Use Pathway Project Phases 1 and 2 – Update” be referred back to staff to bring back information on other routes and options to better connect our existing networks.
SP23/3-1 It was moved and seconded
That the staff report titled “Steveston Highway Multi-Use Pathway Project Phases 1 and 2 – Update” be referred back to staff to bring back information on other routes and options to better connect our existing networks.