SP23/3-1 It was moved and seconded
That the staff report titled “Steveston Highway Multi-Use Pathway Project Phases 1 and 2 – Update” be referred back to staff to bring back information on other routes and options to better connect our existing networks.
SP23/3-2 It was moved and seconded
( 1 ) That Option 1 as described in the staff report titled “Steveston Highway Multi-Use Pathway Project Phases 1 and 2 – Update”, dated May 10, 2023, from the Director, Transportation and the Director, Engineering be approved; and
( 2 ) That the Consolidated 5 Year Financial Plan (2023-2027) be amended accordingly.