MetroVote 简体中文
公开试运行资料持续补充 · 名单日期见各选举页查看范围 ↗
SURREY · 正式动议

36 Avenue 一地分三与溪岸许可/申请 7922-0271-00 · 起草溪岸开发许可,并让地块偏差进入公众通知

查看同一事项的跨会议时间线:36 Avenue 一地分三与溪岸许可/申请 7922-0271-00 →
2023-04-17RES.R23-694
起草溪岸开发许可,并让地块偏差进入公众通知 →
该条动议通过

提议:Councillor Bains;附议:Councillor Kooner。这是程序角色,不代表个人投票。

R23-694:Bains 提议、Kooner 附议;议会通过起草溪岸开发许可,并让地块偏差进入公众通知。

这条动议未明确记名个人票;不从“通过”或在场名单推算赞成。

官方英文动议与结果
It was Moved by Councillor Bains Seconded by Councillor Kooner That: 1. Council authorize staff to draft Development Permit No. 7922-0271-00 for Sensitive Ecosystems (Streamside Areas), generally in accordance with the attached drawings (Appendix III), and the finalized Ecosystem Development Plan. 2. Council approve Development Variance Permit No. 7922-0271-00, varying the following, to proceed to Public Notification: (a) to reduce the minimum lot width of the "Comprehensive Development Zone (CD)" (Bylaw No. 13614) from 26 metres to 21.7 metres for proposed Lot 3; and (b) to reduce the minimum lot depth of the "Comprehensive Development Zone (CD)" (Bylaw No. 13614) from 36 metres to 35.5 metres for proposed Lot 3. 3. Council instruct staff to resolve the following issues prior to final issuance: (a) Development Variance Permit will be brought forward for issuance and execution by the Mayor and City Clerk once the conditions of approval associated with the subdivision have been completed; Regular Council - Land Use Minutes April 17, 2023 Page 4 (b) ensure that all engineering requirements and issues including restrictive covenants, dedications, and rights-of-way where necessary, are addressed to the satisfaction of the General Manager, Engineering; (c) submission of a subdivision layout to the satisfaction of the Approving Officer; (d) submission of a finalized landscaping plan and landscaping cost estimate to the specifications and satisfaction of the Planning and Development Department; (e) submission of a finalized tree survey and a statement regarding tree preservation to the satisfaction of the City Landscape Architect; (f) the applicant satisfy the deficiency in tree replacement on the site, to the satisfaction of the Planning and Development Department; (g) submission of a finalized Ecosystem Development Plan and Impact Mitigation Plan to the satisfaction of City staff; (h) the applicant adequately address the City’s needs with respect to the City’s Affordable Housing Strategy, to the satisfaction of the General Manager, Planning & Development Services; (i) demolition of existing buildings and structures to the satisfaction of the Planning and Development Department; and (j) registration of a combined Statutory Right-of-Way / Section 219 Restrictive Covenant over the designated Streamside Protection Area for both "No Build" and conveyance access. RES.R23-694 Carried

官方会议记录中的程序和结果,不等同于个人政策立场。

核验版本与依据

修订 f3eb01d4-e04a-4a80-b97d-da9c59a7d0c3

程序解释规则:surrey-explicit-procedure-v1

Surrey PLR_7922-0271-00.pdf planning report · PDF 第 6 页

Surrey 2023-04-17 市议会土地使用会议 · PDF 第 3–4 页

Surrey 2023-04-17 市议会土地使用会议 · PDF 第 3 页

Surrey 2023-04-17 市议会土地使用会议 · PDF 第 1 页

同源 JSON ↗