MetroVote 简体中文
公开试运行资料持续补充 · 名单日期见各选举页查看范围 ↗
SURREY · 事项说明

3288 号 194 Street:旧工业园两项许可归档

已收录议会记录:

2023 年市议会归档工业园旧 DP/DVP 并移除产权注记;同一动议另行推进替代申请 -02。

Surrey · 直接动议:1 场会议 · 1 条

地点与旧申请

3288 号 194 Street 的申请涉及此前获批的工业商业园建筑。纪要列 Qrd (Ch194) Holdings Inc. 为业主、KCC Architecture 为代理;-01 是原有 DP 与 DVP 的许可编号。

议会决定

2023 年 4 月 17 日,Bose 提议、Hepner 附议的 R23-722 通过。第 1 款把 -01 的 DP、DVP 归档,并决定从产权登记移除 CA8991790、CA8991791 两项注记;其余条款启动同址 -02 的修订方案。

旧许可的归档决定不等于替代许可已经签发。

决定如何推进

按会议查看原始决定

JSON ↗

提议、附议是程序角色;记名票依据官方纪要或结构化投票记录中明确列出的票态显示。

2023-04-17 · 1 条动议

2023-04-17 Surrey 市议会土地使用会议 →

2023-04-17RES.R23-722
3288 号 194 Street:旧许可归档并启动替代方案 →
该条动议通过

提议:Councillor Bose;附议:Councillor Hepner

Bose 提议、Hepner 附议的 R23-722 通过:第 1 款归档 -01 的 DP/DVP 并移除两项产权注记;第 2–4 款起草 -02 修订 DP、推进 DVP 公告并列最终批准前条件。

官方英文动议与结果
It was Moved by Councillor Bose Seconded by Councillor Hepner That: 1. Council File Development Permit No. 7917-0529-01 and Development Variance Permit No. 7917-0529-01 and remove notations CA8991790 and CA8991791 for both permits on Title. 2. Council authorize staff to draft the amended Development Permit No. 7917-0529-02 generally in accordance with the attached drawings (Appendix I). 3. Council approve Development Variance Permit No. 7917-0529-02, varying the following, to proceed to Public Notification: (a) to vary the maximum principal building height of the "Business Park 1 Zone (IB-1)" from 14 metres to 17.3 metres and the maximum structure height for silos from 6.0 metres to 12.5 metres; (b) to reduce the rate at which parking is calculated for industrial floor area associated with the proposed building from 1 parking space per 100 square metres to 0.795 parking spaces per 100 square metres; and (c) to vary off-street parking and loading/unloading space by allowing passenger vehicle spaces to be located in front of overhead loading doors. 4. Council instruct staff to resolve the following issues prior to final approval: (a) resolution of all urban design issues to the satisfaction of the Planning and Development Department; (b) submission of a finalized landscaping plan and landscaping cost estimate to the specifications and satisfaction of the Planning and Development Department; (c) submission of a finalized tree survey and a statement regarding tree preservation to the satisfaction of the City Landscape Architect; and (d) the applicant satisfy the deficiency in tree replacement on the site, to the satisfaction of the Planning and Development Department. RES.R23-722 Carried