MetroVote 简体中文
公开试运行资料持续补充 · 名单日期见各选举页查看范围 ↗
SURREY · 事项说明

2508 号 Bayview Street:坡地独立住宅与退距申请

已收录议会记录: 至

2508 号 Bayview Street 拟建独立住宅,申请调整二层面积与前院退距;议会先推进许可草拟和公示,后有条件支持偏差许可。

Surrey · 直接动议:2 场会议 · 2 条

地点与住宅方案

2508 号 Bayview Street 约 492 平方米空地拟建独立住宅。报告称地块植被茂密、坡度较大,附近曾有坡地不稳定记录。听证纪要列 Hyer Homes & Renovations 为申请代理。

二层和前院申请改动

申请拟将二层最大面积由首层的 80% 调为 101%,二层相对首层墙面的最小退进由 20% 调为 0%,前院退距由 6.5 米减至 2.7 米。这些是拟议偏差,不代表房屋已获准建造。

生态与树木条件

拟议开发许可涉及陡坡和敏感生态区,最终通过前须提交获接受的生态发展、影响缓解、岩土及树艺报告,并登记坡地稳定限制契约。规划报告正文记场内 18 棵树、拟移除 14 棵,且数目可在树艺报告最终批准前改变。附录树表的表头写 2805 Bayview Street、页脚写 2508,较细的补种数字暂不作为已核本地事实。

两次议会决定

2026-03-09 R26-590 由 Kooner 提议、Bains 附议,授权开发许可草拟,并让偏差许可进入公众通知。4 月 13 日同两人提议、附议的 R26-878 只支持偏差许可,须待关联开发许可最终批准后才考虑签发。公听纪要说本提案未收到书面意见;该页上一事项的反对信不属于本案。

开发许可最终批准、偏差许可正式签发及树艺条件履行尚未核实。

决定如何推进

按会议查看原始决定

JSON ↗

提议、附议是程序角色;记名票依据官方纪要或结构化投票记录中明确列出的票态显示。

2026-03-09 · 1 条动议

2026-03-09 Surrey 市议会土地使用会议 →

2026-03-09RES.R26-590
坡地住宅:推进开发许可草拟及偏差公示 →
该条动议通过

提议:Councillor Kooner;附议:Councillor Bains

Kooner 提议、Bains 附议;授权草拟坡地与敏感生态开发许可,并推进二层面积、错层及前院退距偏差许可的公众通知。

官方英文动议与结果
It was Moved by Councillor Kooner Seconded by Councillor Bains That: 1. Council authorize staff to draft Development Permit No. 7920-0156-00 for Hazard Lands (Steep Slopes) and Sensitive Ecosystems (Green Infrastructure Area) in accordance with the final Ecosystem Development Plan and Geotechnical Report. 2. Council endorse Development Variance Permit No. 7920-0156-00, varying the following in the Zoning By-law, to proceed to Public Notification and bring the Development Variance Permit forward for an indication of support by Council: (a) in Section D.4(a) of Part 15 Urban Residential Zone (R3) the maximum permitted floor area of a second storey is increased from 80% of the area of the first storey to 101% and the minimum offset requirement of a second storey is reduced from 20% to 0%, for a principal building; and (b) in Section F.1 of Part 15 Urban Residential Zone (R3), reduce the minimum front yard setback from 6.5 metres to 2.7 metres to the principal building face. If supported, the Development Variance Permit will be brought forward for issuance and execution by the Mayor and City Clerk in conjunction with the final adoption of the associated Development Permit. 3. Council instruct staff to resolve the following issues prior to final approval: (a) submission and acceptance of a finalized arborist report, including satisfying the required tree replacement, to the satisfaction of the Planning and Development Department; (b) submission and acceptance of a finalized Ecosystem Development Plan and Impact Mitigation Plan to the satisfaction of the Planning and Development Department; (c) submission and acceptance of a finalized Geotechnical Report to the satisfaction of City staff; and (d) registration of a Section 219 Restrictive Covenant for slope stability. RES.R26-590 Carried
2026-04-13 · 1 条动议

2026-04-13 Surrey 市议会公开听证会议 →

2026-04-13RES.R26-878
坡地住宅:有条件支持偏差许可 →
该条动议通过

提议:Councillor Kooner;附议:Councillor Bains

Kooner 提议、Bains 附议;议会支持偏差许可,但只在关联开发许可最终批准后考虑签发。

官方英文动议与结果
It was Moved by Councillor Kooner Seconded by Councillor Bains That Council support Development Variance Permit No. 7920-0156-00 and consider issuance of the Permit upon final approval of the associated Development Permit. RES.R26-878 Carried