MetroVote 简体中文
公开试运行资料持续补充 · 名单日期见各选举页查看范围 ↗
SURREY · 正式动议

9575 号 180 Street 临时卡车停车/7920-0219-00:公示与生态许可起草

查看同一事项的跨会议时间线:9575 号 180 Street 临时卡车停车/7920-0219-00 →
2024-06-10RES.R24-1141
9575 号 180 Street 临时卡车停车/7920-0219-00:公示与生态许可起草 →
该条动议通过

提议:Councillor Stutt;附议:Councillor Bains。这是程序角色,不代表个人投票。

Stutt 提议、Bains 附议的 R24-1141 仅推进 TUP 公示、溪岸生态许可起草,并要求先处理道路、溪岸、景观和历史填土等条件。

这条动议未明确记名个人票;不从“通过”或在场名单推算赞成。

官方英文动议与结果
It was Moved by Councillor Stutt Seconded by Councillor Bains That: 1. Council approve Temporary Use Permit No. 7920-0219-00, to proceed to Public Notification. 2. Council authorize staff to draft Development Permit No. 7920-0219-00 for Sensitive Ecosystems (Streamside Areas), generally in accordance with the attached drawings (Appendix I), as well as the finalized Ecosystem Development Plan, Construction Environmental Management Plan and Wetland Assessment Memorandum. Regular Council - Land Use Minutes June 10, 2024 Page 22 3. Council instruct staff to resolve the following issues prior to final approval: (a) ensure that all engineering requirements and issues including restrictive covenants, dedications, and rights-of-way where necessary, are addressed to the satisfaction of the General Manager, Engineering; (b) registration of a combined Statutory Right-of-Way / Section 219 Restrictive Covenant over the designated Streamside Protection Area for both "No Build" and conveyance access; (c) input from the Ministry of Transportation & Infrastructure; (d) input from TransLink; (e) submission of a finalized landscaping and fencing plan and landscaping and fencing cost estimate to the specifications and satisfaction of the Planning and Development Department; (f) submission of a finalized tree survey and a statement regarding tree preservation to the satisfaction of the City Landscape Architect; (g) submission of a finalized Sensitive Ecosystem Development Plan to the satisfaction of City staff; (h) installation and subsequent inspection and approval of all required landscape screening and fencing works, to the satisfaction of the General Manager, Planning & Development; (i) submission of financial securities to ensure that landscaping and fencing is maintained over the course of the Temporary Use Permit, to the satisfaction of the General Manager, Planning & Development; (j) registration of a combined Restrictive Covenant/Right-of-Way against the property to ensure safeguarding and maintenance of the Streamside Protection Area on the site; and (k) the applicant obtain a soil permit for unauthorized historical fill on the property. RES.R24-1141 Carried

官方会议记录中的程序和结果,不等同于个人政策立场。

核验版本与依据

修订 18ccc6d8-51d9-4041-a402-da130c65e2a7

程序解释规则:surrey-explicit-procedure-v1

Surrey 2024-06-10 市议会土地使用会议 · PDF 第 21–22 页

Surrey 2024-06-10 市议会土地使用会议 · PDF 第 22 页

Surrey 2024-06-10 市议会土地使用会议 · PDF 第 21 页

Surrey 2024-06-10 市议会土地使用会议 · PDF 第 1 页

同源 JSON ↗