MetroVote 简体中文
公开试运行资料持续补充 · 名单日期见各选举页查看范围 ↗
SURREY · 固定版本 · PDF 第 7 页

Surrey planning report 7922-0218-00

这段原文取自本站留存的同一份 PDF,仅展示本条相关文本;官方在线版本可能更新。

Staff Report to Council Application No.: 7922-0218-00 Planning & Development Report Page 7 School District: The School District has advised that there will be approximately 14 school-age children generated by this development, of which the School District has provided the following expected student enrollment. 9 Elementary students at Harold Bishop Elementary School 3 Secondary students at Johnston Heights Secondary School (Appendix III) Note that the number of school-age children is greater than the expected enrollment due to students attending private schools, home school or different school districts. The applicant has advised that the dwelling units in this project are expected to be constructed and ready for occupancy by January, 2027. Parks, Recreation & Culture: No concerns. The North Surrey Sport & Ice Complex land contains amenities including a playground and natural area (10B Greenbelt) south of the building. These lands are 650 metres walking distance from the proposed development. Surrey Fire Department: No concerns. TransLink: Advisory Design Panel: TransLink comments are pending. The applicant will be required to address any TransLink Requirements prior to final adoption. The proposal was considered at the ADP meeting on November 9, 2023 and was supported. The applicant has resolved most of the outstanding items from the ADP review, as outlined in the Development Permit section of this report. Any additional revisions will be completed prior to Council’s consideration of Final Adoption of the rezoning by-law, to the satisfaction of the Planning and Development Department. Transportation Considerations Road Network and Infrastructure  As part of the subject development, the applicant will be providing the following road improvements: o Construction of a sidewalk on 128 Street; o Dedication and construction of 111 Avenue to the City’s collector road standard; and o Construction of 128A Street to the City’s local road standard. Traffic Impacts

非商业公共资料研究与事实报道;仅展示核对事实所需的已评估摘录及本站中文说明。版权归原作者或发布机构;不表示来源机构认可本站。原文、来源及使用条款见链接。 来源使用条款 ↗

打开官方 PDF ↗
版本与字符定位

留存文件 SHA-256:b6240be1be6b551fb7f9214f295560a65f6363cde76e14fa18ccafcb26b8de46

文本 SHA-256:03e4308b37a05d4956c4f53d0838a1967dd1c3ab2bec2b49f146adf4b6d334b8

抽取:pymupdf-1.26.7-text-pages-v1
第 7–7 页;字符 11097–13108(末端不含)