STEVESTON HIGHWAY MULTI-USE PATHWAY PROJECT PHASES 1 AND 2 – UPDATE
这段原文取自本站留存的同一份 PDF,仅展示本条相关文本;官方在线版本可能更新。
Understanding that there is concern with the reduction of vehicle lane widths on Steveston
Highway, staff developed an alternate design option that maintains the existing centre lane
widths and adjusts the curb lanes to 3.6 metres, minimizing the impact to the average width of
the existing curb lanes. This is achieved by applying the BC Active Transportation Design Guide
recommended minimum widths of 2.7 metres for
a MUP and 0.6 metres for a buffer zone
between the curb lane and pathway. These widths are also the minimum design parameters
required to meet the terms ofthe $5.5M ofsecured external grant funding for this project.
Designing to these minimum requirements would largely maintain the MUP functionality while
significantly reducing the impact of the existing lane widths.
非商业公共资料研究与事实报道;仅展示核对事实所需的已评估摘录及本站中文说明。版权归原作者或发布机构;不表示来源机构认可本站。原文、来源及使用条款见链接。 来源使用条款 ↗
打开官方 PDF ↗版本与字符定位
留存文件 SHA-256:aaaaee4bb4d47172c7dd0d3854a93e17f4bef060b1f56c4c1d72fcca678e0d78
文本 SHA-256:8b1788b32a60bba790c11534156a6c80fe5b4cb2f799d7740c5a145473142ceb
抽取:pymupdf-1.26.7-native-footer-ocr150-eng-7d4322bd2a774972-v1
第 2–2 页;字符 2689–3477(末端不含)