STEVESTON HIGHWAY MULTI-USE PATHWAY PROJECT PHASES 1 AND 2 – UPDATE
这段原文取自本站留存的同一份 PDF,仅展示本条相关文本;官方在线版本可能更新。
With the reduction of the boulevard width to the minimum 0.6 meters, staff would also recommend
the inclusion of an additional physical barrier in the form offencing or railing which would help
delineate MUP users from traffic. There would be locations along the MUP where gaps in the
railing would be required to facilitate access for driveways and bus stops.