MetroVote 简体中文
公开试运行资料持续补充 · 名单日期见各选举页查看范围 ↗
RICHMOND · 固定版本 · PDF 第 12 页

OFFICIAL COMMUNITY PLAN BYLAW 7100 AND 9000, AMENDMENT BYLAW 10213 AND RICHMOND ZONING BYLAW 8500, AMENDMENT BYLAW 10212 (RZ 17-788900)

这段原文取自本站留存的同一份 PDF,仅展示本条相关文本;官方在线版本可能更新。

District Energy Utility (DEU): The subject site is located within the City Centre DEU service area. Prior to rezoning bylaw adoption, a standard DEU covenant will be registered on title requiring the developer to: a) Design and construct a low carbon energy plant and transfer it to the City, all at the developer’s cost, together with compatible building and mechanical systems, to facilitate the development’s connection to a City District Energy Utility; or b) If connection to the City Centre DEU is available, connect to the City Centre DEU for space and domestic hot water heating services, and design and construct a low carbon energy plant for cooling services only and transfer it to the City, all at the developer’s cost. 2. BC Energy Step Code: City policy requires that new buildings are designed and constructed to satisfy BC Energy Step Code requirements. Hotels with an on-site low carbon energy plant and office buildings must comply with “Step 2” or better. Prior to rezoning adoption, through the Development Permit process, the developer will be required to conduct energy modelling and provide a statement to the City confirming that the proposed design can meet the applicable Step Code requirements.

非商业公共资料研究与事实报道;仅展示核对事实所需的已评估摘录及本站中文说明。版权归原作者或发布机构;不表示来源机构认可本站。原文、来源及使用条款见链接。 来源使用条款 ↗

打开官方 PDF ↗
版本与字符定位

留存文件 SHA-256:599c662b99d1ff65c0af09e97580f06012aa4f0f5d198d09287505890ccf7042

文本 SHA-256:4eabef9e85ce34db2bf39d42c1584e0ade44a865c259367f2bfe739bc785ec0b

抽取:pymupdf-1.26.7-text-pages-v1
第 12–12 页;字符 29866–31106(末端不含)