MetroVote 简体中文
公开试运行资料持续补充 · 名单日期见各选举页查看范围 ↗
RICHMOND · 固定版本 · PDF 第 1 页

STEVESTON HIGHWAY MULTI-USE PATHWAY PROJECT PHASES 1 AND 2 – UPDATE

这段原文取自本站留存的同一份 PDF,仅展示本条相关文本;官方在线版本可能更新。

The current design of the Steveston Multi-Use Path (MUP) Project Phase 1 and 2 includes a 3.0 metre MUP with a minimum 1.0 metre to 1.5 metre boulevard between the traffic lane and pathway. To accommodate this within the existing City property, a reallocation of excess pavement width in some of the wider travel lanes on Steveston Highway has been designed for a large portion of the project length. In accordance with urban Arterial road design standards, the curb lanes are proposed to be 3.25 metres wide.

非商业公共资料研究与事实报道;仅展示核对事实所需的已评估摘录及本站中文说明。版权归原作者或发布机构;不表示来源机构认可本站。原文、来源及使用条款见链接。 来源使用条款 ↗

打开官方 PDF ↗
版本与字符定位

留存文件 SHA-256:aaaaee4bb4d47172c7dd0d3854a93e17f4bef060b1f56c4c1d72fcca678e0d78

文本 SHA-256:8b1788b32a60bba790c11534156a6c80fe5b4cb2f799d7740c5a145473142ceb

抽取:pymupdf-1.26.7-native-footer-ocr150-eng-7d4322bd2a774972-v1
第 1–1 页;字符 1428–1937(末端不含)