MetroVote 简体中文
公开试运行资料持续补充 · 名单日期见各选举页查看范围 ↗
RICHMOND · 事项说明

授予床垫回收服务合约并要求扩大生产者责任 · 事项说明

已收录议会记录:

市议会通过合约8321NOITC授予 Pacific Mattress Recycling Inc.,最长五年估算总值1,961,629.39加元;授权签订服务合同,并批准向 Sierra Waste Services Ltd. 的现有合约发出变更单,增加床垫和软垫家具转运费用,年度估算203,938.85加元。另通过致函省府,要求建立软垫家具生产者延伸责任计划并加速床垫及床垫底座相关计划。第4部分 Au、Loo议员反对。

Richmond · 直接动议:1 场会议 · 1 条

2024-07-22 · R24/14-11

市议会通过第一至三部分:授予 Pacific Mattress Recycling Inc. 最长五年、估算1,961,629.39加元合约;授权签约并批准给 Sierra Waste Services Ltd. 的变更单,转运费用年度估算203,938.85加元。另通过第4部分政策倡议,要求省府建立家具生产者延伸责任并加速床垫计划;Au、Loo议员反对第4部分。

2024-07-22 · 直接链接报告中的方案与条件

该项直接链接的采购报告说明,Pacific Mattress 与原服务商合并后成为报告所知的Lower Mainland唯一床垫及软垫家具处理回收服务商;市府先发布意向合约公告,公示期没有收到异议,随后与服务商协商商业条款。会议授权谈判并签约,所以这里记录的是合约授予及签约授权,不把它写成合同已签署。

最长五年的1,961,629.39加元估算总额与给Sierra Waste Services的年度估算203,938.85加元转运变更单分别记录;对省府的生产者责任倡议也与采购决定区分。

决定如何推进

按会议查看原始决定

JSON ↗

提议、附议是程序角色;记名票依据官方纪要或结构化投票记录中明确列出的票态显示。

2024-07-22 · 1 条动议

2024-07-22 Richmond 市议会常规会议 →

2024-07-22R24/14-11
正式动议 →
原文分别记载各部分结果

本条保存该次正式提案;已核验的处置在下方列出,具体事项说明见关联事项页。

提案提出后曾有中断、修订或分项处理;本页结果已按同一留存纪要中的实际提问对象逐条绑定。 官方投票行尚不能可靠区分各部分范围,未将这些行分配为个人分项票。

各部分结果
官方英文动议与结果
R 24 /14-11 It was moved and seconded ( 1 ) That Contract 8321NOITC – Mattress and Upholstered Furniture Recycling Services, be awarded to Pacific Mattress Recycling Inc. at an estimated total contract value of $1,961,629.39 over a maximum five-year term; ( 2 ) That the Chief Administrative Officer and General Manager, Engineering & Public Works, be authorized to negotiate and execute a service contract with Pacific Mattress Recycling Inc. incorporating the key terms outlined in the staff report dated June 12, 2024; (3) That a Change Order for contract 6205P – Residential Solid Waste Collection and Recycling Services with Sierra Waste Services Ltd. be issued to include cross-docking and transportation fees for mattresses and upholstered furniture at the unit prices quoted at an additional annual estimated cost of $203,938.85; and (4) That, in alignment with the Richmond Circular City Strategy, a letter be written to the Minister of Environment and Climate Change Strategy, to request the establishment of an extended producer responsibility program for upholstered furniture and acceleration of the planned extended producer responsibility program for mattresses and mattress foundations in British Columbia.