合约 1721-003-21 判给 B.A. Blacktop Infrastructure Inc.($7,572,485.64 含 GST)用于 140 Street Widening and Bear Creek Bridge Replacement,另批准 $157,500 支付 TELUS 迁改基础设施(RES.R25-1808,H.R147 项,第 20 页)
已收录议会记录:
这是 H.R147 项:第 20 页由 Councillor Kooner 提出、Councillor Bains 附议,Council 通过六项决议——1. 将合约 1721-003-21 判给 B.A. Blacktop Infrastructure Inc.,金额 $7,572,485.64(含 GST),用于 140 Street Widening and Bear Creek Bridge Replacement;2. 该合约支出授权上限设为 $8,330,000.00(含 GST 与应急费);3. 批准支出 $157,500(含 GST)支付 TELUS,用于 140 Street Road and Bridge Improvements 的基础设施迁改;4. 将顾问协议 1721-003 C1 判给 McElhanney Ltd.,金额 $227,052.00(含 GST);5. 该顾问协议支出授权上限设为 $250,000(含应急费与 GST);6. 授权 General Manager, Engineering 签署上述合约与顾问协议。决议号 RES.R25-1808,结果通过。本会话核对到的动议日期范围为 2025-07-14 至 2025-07-14(端点取 motions[] 所载会议日期 2025-07-14 regular_council_public_hearing,单日)。
道路与桥梁工程合约判给(动议第 1、2 项)
第 20 页载明:Award Contract No. 1721-003-21 to B.A. Blacktop Infrastructure Inc. in the amount of $7,572,485.64 (including GST) for the 140 Street Widening and Bear Creek Bridge Replacement;并将支出授权上限 Set the expenditure authorization limit for Contract No. 1721-003-21 at $8,330,000.00 (including GST and contingency)。
批准 TELUS 基础设施迁改支出(动议第 3 项)
第 20 页载明:Approve the expenditure of $157,500 (including GST) payable to TELUS for the relocation of infrastructure for 140 Street Road and Bridge Improvements。
顾问协议判给与上限(动议第 4、5 项)
第 20 页载明:Award Consultant Agreement No. 1721-003 C1 to McElhanney Ltd. in the amount of $227,052.00 (including GST) for the related engineering construction services;并将该顾问协议支出授权上限 Set the expenditure authorization limit for Consultant Agreement No. 1721-003 C1 at $250,000 (including contingencies and GST)。
Surrey 2025-07-14 市议会公开听证会议 · 4 处摘录
授权签署与决议结果(动议第 6 项)
第 20 页载明:Authorize the General Manager, Engineering to execute Contract No. 1721-003-21 and Consultant Agreement No. 1721-003 C1;决议号 RES.R25-1808,结果通过。动议由 Councillor Kooner 提出、Councillor Bains 附议。
判给、批准支出与授权签署都不等于工程已开工、款项已支付或管线迁改已完成;第 3 项写的是 approve the expenditure(批准支出),原文未记录实际支付;支出授权上限不等于实际支出;原文未记录工期、道路拓宽长度、桥涵规格与通车日期;原文未记录票数,只记 Carried;本批未取得条目页。
决定如何推进
- 摘要已有核验依据,结构化动议关联待补。已核验的过程及结果请见摘要和来源;尚未关联直接动议不代表没有决定。
按会议查看原始决定
JSON ↗提议、附议是程序角色;记名票依据官方纪要或结构化投票记录中明确列出的票态显示。