Surrey planning report 7922-0118-00
这段原文取自本站留存的同一份 PDF,仅展示本条相关文本;官方在线版本可能更新。
Staff Report to Council
Application No.: 7922-0118-00
Planning & Development Report
Page 4
DEVELOPMENT PROPOSAL
Planning Considerations
The proposal is a Development Variance Permit to reduce the side yard and front yard setback
requirements for Accessory Buildings and Structures to allow for electric vehicle charging
stations and accompanying infrastructure.
The application proposes a minor amendment to Development Permit No. 7897-0071-00 in
order to accommodate changes to the landscaping where the EV charging stations and
accompanying infrastructure will be located. Should the subject proposal be supported by
Council, staff will consider the proposed changes through a minor amendment to
Development Permit No. 7897-0071-00 as part of the Building Permit application associated
with this proposal . Changes proposed include the following:
o removal of select shrubs and landscaping features, and the refurbishment of existing
planting beds and shrubs;
o removal of 1 tree, to be replaced by two trees;
o removal of wooden arbor posts and concrete path at the northeast corner of the site,
and replacement with concrete path approximately 1 metre west; and
o addition of planting and fencing to screen EV equipment and infrastructure.
The proposal is consistent with the following OCP policies:
o C1.27 Consider energy efficiency in community planning and building design. Support
land uses, development plans, transportation, and utility infrastructure, building
forms and energy alternatives that increase energy efficiency and conservation in a
sustainable manner;
o C1.34 Encourage upgrading of existing buildings during alterations, additions, or
redevelopment to accommodate infrastructure for solar hot water and/or electric
vehicle charging stations.
Corporate Report O-58 require that new gas stations provide alternative fuel infrastructure in
conjunction with the gas station. The proposed development serves the goals of this policy by
providing alternative fuel infrastructure on an existing lot.
Referrals
Engineering:
The Engineering Department has no objection to the project.
Transportation Considerations
The proposed variance will allow for the expansion of the City’s EV charging station network,
supporting OCP policies to expand energy efficient transportation infrastructure.
非商业公共资料研究与事实报道;仅展示核对事实所需的已评估摘录及本站中文说明。版权归原作者或发布机构;不表示来源机构认可本站。原文、来源及使用条款见链接。 来源使用条款 ↗
打开官方 PDF ↗版本与字符定位
留存文件 SHA-256:6e39c083bf7e0a9d47da6462210624ac62bb787585fce6e83309312a8ccf7a36
文本 SHA-256:7ee418b5fe672ad64ff0cd4d9796a2c284432ac1d5e83f02ecce081c3cdd81ce
抽取:pymupdf-1.26.7-text-pages-v1
第 4–4 页;字符 3473–5868(末端不含)