Surrey 7922-0116-00 April 17 2023 planning report
这段原文取自本站留存的同一份 PDF,仅展示本条相关文本;官方在线版本可能更新。
Staff Report to Council
Application No.: 7922-0116-00
Planning & Development Report
Page 12
•
A Riparian Area Protection Regulation (RAPR) report and an Ecosystem Development Plan,
prepared by Mark Gollner, R.P. Bio, of Marlim Ecological Consulting Ltd., calculated the
streamside protection and enhancement area (SPEA) as 15 metres from top of bank. The RAPR
report was submitted to the Province and selected for exclusion from formal review as the
QEP has indicated that the proposed development will meet the Riparian Protection
Standard.
•
The EDP was peer reviewed by Chris Macmillan, R.P. Bio., of Santori Environmental Inc. The
Peer Reviewer found that the setback requirements of Part 7A of the Zoning Bylaw No. 12000
were determined accurately, and the RAPR Setback met the overall intent of the regulation.
•
The recommendations of the reports were review by staff and found to be generally
acceptable, with some modification to content and format of the report required. The
finalized report and recommendations will be incorporated into the Development Permit
prior to final issuance of the Development Permit.
•
The riparian area is proposed to be conveyed to the City as a lot for conservation purposes as a
condition of rezoning approval, in compliance with the OCP.
Sensitive Ecosystems (Green Infrastructure Areas) Development Permit Requirement
•
The subject property falls within the Sensitive Ecosystems DPA for Green Infrastructure Areas
in the OCP, given the location of a Biodiversity Conservation Strategy (BCS) Green
Infrastructure Network (GIN) Hub located to the west of the subject site. The Sensitive
Ecosystems (Green Infrastructure Areas) Development Permit is required to protect
environmentally sensitive and/or unique natural areas from the impacts of development.
•
The City of Surrey Biodiversity Conservation Strategy (BCS) Green Infrastructure Network
(GIN) map, adopted by Council on July 21, 2014 (Corporate Report No. R141; 2014), identifies a
portion of the Tynehead BCS management area west of the subject site as having High
ecological value.
•
The BCS further identifies the western portion of the subject site as having a Very High and
Moderate High habitat suitability rating, derived from species at risk presence, species
accounts and known ecosystem habitat inventories.
•
The development proposal conserves 1,484 square meters of the subject site through Riparian
Conveyance which is 75 % of the total gross area of subject site. This method of GIN retention
will assist in the long-term protection of the natural features and allows the City to better
achieve biodiversity at this location consistent with the guidelines contained in the BCS.
•
An Ecosystem Development Plan, prepared by Mark Gollner, R.P. Bio., of Marlim Ecological
Consulting Ltd. was reviewed by staff, and peer reviewed by Chris Macmillan, R.P. Bio, of
Santori Environmental Inc., and found to be generally acceptable, with some modifications to
content and format of the report still required. The finalized report and recommendations will
be incorporated into the Development Permit.
Hazard Lands (Steep Slope) Development Permit Requirement
非商业公共资料研究与事实报道;仅展示核对事实所需的已评估摘录及本站中文说明。版权归原作者或发布机构;不表示来源机构认可本站。原文、来源及使用条款见链接。 来源使用条款 ↗
打开官方 PDF ↗版本与字符定位
留存文件 SHA-256:dd8888df85502ba4b751dccdbc182bed50bc57b586937c6cddf3229c57b75722
文本 SHA-256:241da70d34ae188eb6f0f5852acbf54f85ae5ec75f019d726adc1872ce505622
抽取:pymupdf-1.26.7-text-pages-v1
第 12–12 页;字符 23858–27108(末端不含)