Surrey 7922-0280-00 May 1 2023 planning report
这段原文取自本站留存的同一份 PDF,仅展示本条相关文本;官方在线版本可能更新。
2372
INTER-OFFICE MEMO
TO:
Manager, Area Planning & Development
- North Surrey Division
Planning and Development Department
FROM:
Development Services Manager, Engineering Department
DATE:
April 11, 2023
PROJECT FILE:
7822-0280-00
RE:
Engineering Requirements (Commercial/Industrial)
Location: 18917 92 Ave
TEMPORARY USE PERMIT
The following are to be addressed as a condition of issuance of the Temporary Use Permit:
•
Confirm road width and integrity from the site to the intersection of 96 Avenue and 180
Street to support truck turning movements, and provide improvements as required.
•
Restrict access to 96 Avenue for all truck access/egress.
•
Construct storm infrastructure upgrades to adequately capture increased road runoff.
•
Secure applicable provincial and federal approvals for all impacted streams, as required.
•
Construct a new metered water service connection, if required.
•
Construct on-site stormwater mitigation features to meet pre-development conditions up
to the 100-year storm event; appropriate geotechnical infiltration testing is required to
verify infiltration capacity to support mitigation features.
•
Construct on-site water quality treatment features.
•
Confirm adequacy of existing on-site sanitary infrastructure and obtain requirement(s)
from Fraser Health and Ministry of Environment, as required.
•
Register restrictive covenant(s) for the on-site stormwater mitigation and water quality.
•
Register restrictive covenant for access restriction above.
A Servicing Agreement is required prior to issuance of the Temporary Use Permit.
Jeff Pang, P.Eng.
Development Services Manager
Appendix II
非商业公共资料研究与事实报道;仅展示核对事实所需的已评估摘录及本站中文说明。版权归原作者或发布机构;不表示来源机构认可本站。原文、来源及使用条款见链接。 来源使用条款 ↗
打开官方 PDF ↗版本与字符定位
留存文件 SHA-256:418251853b5d3f7479dc449df7cecfb1c0048957786497016f9d8d4cf23ee72d
文本 SHA-256:2a6b9c945962d93ec0dab4d416a87319e4fe92145fb82ed904523465276fc126
抽取:pymupdf-1.26.7-text-pages-v1
第 12–12 页;字符 20442–22150(末端不含)