MetroVote 简体中文
公开试运行资料持续补充 · 名单日期见各选举页查看范围 ↗
SURREY · 固定版本 · PDF 第 20 页

Surrey planning report 7922-0151-00

这段原文取自本站留存的同一份 PDF,仅展示本条相关文本;官方在线版本可能更新。

Staff Report to Council Application No.: 7922-0151-00 Planning & Development Report Page 8 IB-2 Zone (Part 47B) Permitted and/or Required Proposed Principal buildings: 14 metres 14 metres Accessory buildings: 6 metres n/a Parking (Part 5) Required Proposed Number of Stalls Commercial: 73 spaces 73 spaces Industrial: 319 spaces 324 spaces Total: 392 spaces 397 spaces Public Art Policy  The applicant will be required to provide public art, or register a Restrictive Covenant agreeing to provide cash-in-lieu, at a rate of 0.5% of construction value, to adequately address the City’s needs with respect to public art, in accordance with the City’s Public Art Policy requirements. The applicant will be required to resolve this requirement prior to consideration of Final Adoption. PUBLIC ENGAGEMENT  Pre-notification letters were sent on January 07, 2025, and the Development Proposal Signs were installed on January 06, 2025. Staff received 3 responses from neighbouring landowners (staff comments in italics):  Tree removal There were some concerns from the public about the removal of trees proposed. The site to the east is part of the Green Infrastructure Network (GIN), and will remain treed, but the subject site is designated for development as business employment. No trees are proposed for removal on the adjacent GIN City lands.  Notifications were also sent to the Friends of Semiahmoo Bay Society, Semiahmoo Residents Association, Little Campbell Watershed Society and the Surrey Board of Trade. No comments were received by staff prior to the finalization of this report. DEVELOPMENT PERMITS Sensitive Ecosystems (Streamside Areas) Development Permit Requirement  The subject property falls within the Sensitive Ecosystems Development Permit Area (DPA) for Streamside Areas in the OCP, given the location of an existing Class B (yellow-coded) pond. The Sensitive Ecosystems (Streamside Areas) Development Permit is required to protect aquatic and terrestrial ecosystems associated with streams from the impacts of development.  Ponds are regulated by both RAPR and Part 7A Streamside Protection. The applicant is adhering to the prescribed setbacks, whichever is the largest. One of the ponds is proposed to be reconfigured, and one removed, and those approvals have already been granted by WSA. The two larger ponds, which are partially on the adjacent property to the west, will remain, with the RAPR setback achieved.

非商业公共资料研究与事实报道;仅展示核对事实所需的已评估摘录及本站中文说明。版权归原作者或发布机构;不表示来源机构认可本站。原文、来源及使用条款见链接。 来源使用条款 ↗

打开官方 PDF ↗
版本与字符定位

留存文件 SHA-256:4b0e1e93ec21e839888a602a602e2f36cb8c854c5b9d398e0e98b4e239b32353

文本 SHA-256:58e996d1c19f3352c0e4d87f002c1260e7573cc85bd7bccd95593195d32874e4

抽取:pymupdf-1.26.7-text-pages-v1
第 20–20 页;字符 27813–30279(末端不含)