RICHMOND ZONING BYLAW 8500, AMENDMENT BYLAW 10416 (RZ 21-940333)
这段原文取自本站留存的同一份 PDF,仅展示本条相关文本;官方在线版本可能更新。
Site Servicing and Frontage Improvements
As a result of water, drainage and frontage improvements installed along Heather Street as part
of the City’s Capital works project prior to the requested rezoning, a $84,251.00 cost recovery
contribution is required to be submitted prior to adoption of the rezoning bylaw.
At subdivision stage, the applicant must enter into a Servicing Agreement for the design and
construction of the required site servicing and off-site improvements as described in
attachment 7, including:
x Dolphin Avenue frontage to be upgraded with a new concrete sidewalk at the property line,
new treed/grassed boulevard, and new concrete curb and gutter, all to match and transition to
the existing upgraded condition to the east at the intersection of Dolphin Avenue and
Heather Street.
非商业公共资料研究与事实报道;仅展示核对事实所需的已评估摘录及本站中文说明。版权归原作者或发布机构;不表示来源机构认可本站。原文、来源及使用条款见链接。 来源使用条款 ↗
打开官方 PDF ↗版本与字符定位
留存文件 SHA-256:6904194ca53fdbe713f8290ce01aeccb622a387536efb463a7e1e49dc13e246b
文本 SHA-256:fedcb0b8260f1fefd5fb2859c50c2fa3d961b569626cd573576c6d19685f6ee7
抽取:pymupdf-1.26.7-text-pages-v1
第 5–5 页;字符 9874–10691(末端不含)