New Capstan Village Neighbourhood Park Public Artwork Concept
这段原文取自本站留存的同一份 PDF,仅展示本条相关文本;官方在线版本可能更新。
The amount allocated for the artwork is $175,650. The artwork budget covers all costs associated
with the creation of the artwork, including artist fee, artwork design, fabrication and installation.
Polygon Talistar will be responsible for all base costs of the pavilion structure and concrete
circular pathway.
非商业公共资料研究与事实报道;仅展示核对事实所需的已评估摘录及本站中文说明。版权归原作者或发布机构;不表示来源机构认可本站。原文、来源及使用条款见链接。 来源使用条款 ↗
打开官方 PDF ↗版本与字符定位
留存文件 SHA-256:7581fd7dfd3ea2b8141c85fa8db5816fbe08f01e3290a360ce9a18ecc5d4ca39
文本 SHA-256:e4220db97691493132f15b5908a6ace66d3281cb757725578951dfaddabb306d
抽取:pymupdf-1.26.7-text-pages-v1
第 4–4 页;字符 8553–8867(末端不含)