Surrey 2023 City Centre two-tower planning report, 7920-0220-00

这段原文取自本站留存的同一份 PDF,仅展示本条相关文本;官方在线版本可能更新。

Transportation Considerations Transit  The Gateway Skytrain Station is located less than 70 metres north of the site, across 108th Avenue at University Drive. Traffic Impacts  The proposed development triggers the requirement for a Transportation Impact Analysis (TIA) to evaluate the surrounding road network and identify any mitigating measures that would be required to address impacts.  According to the TIA, using industry standard rates, the proposed development is anticipated to generate approximately four to five vehicles every minute during the peak hour.  Additional infrastructure requirements, including improvements to intersections that may be outside of the site frontages, are to be constructed at the applicant’s cost as per the TIA results to adequately mitigate traffic impacts. Road Network and Infrastructure  The applicant is required to provide the following improvements along the site frontages: o University Drive to the City Centre arterial road standard; o 107A Avenue to the City Centre collector road standard; o City Parkway to the City Centre collector road standard; and o A new green lane along the northern property line of the site, which will ultimately connect north to 108 Ave to provide parking and loading access for the block.

非商业公共资料研究与事实报道;仅展示核对事实所需的已评估摘录及本站中文说明。版权归原作者或发布机构;不表示来源机构认可本站。原文、来源及使用条款见链接。 来源使用条款 ↗

打开官方 PDF ↗
版本与字符定位

留存文件 SHA-256:7cd91893805cbfde09649ee23c57d3c82da4da2466cb1023bddcc7fe6e2cdc6a

文本 SHA-256:1e9be372fe9139f17ee52d20ef02d06a33db5312a16840a8b73018d78cfdd52a

抽取:pymupdf-1.26.7-text-pages-v1
第 8–8 页;字符 13151–14437(末端不含)