MetroVote 简体中文
公开试运行资料持续补充 · 名单日期见各选举页查看范围 ↗
SURREY · 固定版本 · PDF 第 21 页

Surrey 2023-07-24 市议会公开听证会议

这段原文取自本站留存的同一份 PDF,仅展示本条相关文本;官方在线版本可能更新。

It was Moved by Councillor Bains Seconded by Councillor Stutt That Council: 1. Award Contract No.1723-010 D1 to Aplin & Martin Consultants Ltd. ("Aplin") in the amount of $337,730.40 (including GST) for the design of 132 Street Arterial Widening between 72 Avenue to 80 Avenue; 2. Set the expenditure authorization limit for Contract No. 1723-010 D1 at $372,000.00 (including contingencies and GST); 3. Authorize the General Manager, Engineering to execute Contract No. 1723-010 D1; 4. Authorize the inclusion in the Contract an option in favour of the City to retain Aplin to provide engineering services for the optional construction services of the 132 Street Arterial Widening between 72 Avenue to 80 Avenue at an estimated fee of $720,000.00 (including contingencies and GST); and 5. Authorize the General Manager, Engineering to award and execute a subsequent contract with Aplin for the optional construction services upon successful completion of the design phase. RES.R23-1542 Carried

非商业公共资料研究与事实报道;仅展示核对事实所需的已评估摘录及本站中文说明。版权归原作者或发布机构;不表示来源机构认可本站。原文、来源及使用条款见链接。 来源使用条款 ↗

打开官方 PDF ↗
版本与字符定位

留存文件 SHA-256:5b0677fcabf5a51cb79c43e00462a01ddd28d9b33c40c2e1953ef6510f86825c

文本 SHA-256:4d2bbb523c3e77594691d5fd05a131f9408cfad756ffc2c6b02b4eabcc58206c

抽取:pymupdf-1.26.7-text-pages-v1
第 21–21 页;字符 41834–42869(末端不含)