Chair’s report
这段原文取自本站留存的同一份 PDF,仅展示本条相关文本;官方在线版本可能更新。
In reply to a query from the Panel, Staff confirmed that in addition to the required five-year
monitoring plan for the replacement plantings and related works associated with the ESA
compensation plan, the project arborist is required to be on-site during the construction period
for any works in or around the tree protection zones including the installation of irrigation
systems.
非商业公共资料研究与事实报道;仅展示核对事实所需的已评估摘录及本站中文说明。版权归原作者或发布机构;不表示来源机构认可本站。原文、来源及使用条款见链接。 来源使用条款 ↗
打开官方 PDF ↗版本与字符定位
留存文件 SHA-256:2b8f70c543f3202e88789487c0eb1a1d02ef51bc603863111e8e3b66e7191292
文本 SHA-256:794f696326765e87b35f12acad15e4a718e636bd0bb44e16fc3ccbfbfc453b08
抽取:pymupdf-1.26.7-text-pages-v1
第 3–3 页;字符 4087–4473(末端不含)