Surrey 2023-09-11 市议会土地使用会议
这段原文取自本站留存的同一份 PDF,仅展示本条相关文本;官方在线版本可能更新。
Regular Council - Land Use Minutes
September 11, 2023
Page 25
18.
7922-0377-00
15330 - 102A Avenue
Owner:
Kelson Guildford Holdings Ltd.
Director Information: S. Dhaliwal, B. Mander
Officer Information as at June 20, 2022:
J. Fawcett (Secretary), R. Fawcett (President)
Agent:
5468796 Architecture Inc. (Colin Neufeld)
OCP Text Amendment to allow a higher density in the Town Centre designation
Town Centre Plan Amendment from "Low to Mid Rise Apartment" to "Mid to High
Rise Mixed-Use"
Partial LUC discharge
Rezoning from CHI to CD (based on RM-135 and C-5)
Development Permit
to permit the development of one 22-storey mixed-use building consisting of 296 dwelling
units with ground-floor commercial space in Guildford Town Centre.
It was
Moved by Councillor Hepner
Seconded by Councillor Kooner
That:
1.
A Bylaw be introduced to amend Official Community Plan (OCP) Table 7A:
Land Use Designation Exemptions within the "Town Centre" designation
by adding site specific permission for the subject site to permit a density up
to 4.6 FAR, and a date be set for Public Hearing.
2.
Council determine the opportunities for consultation with persons,
organizations and authorities that are considered to be affected by the
proposed amendment to the OCP, as described in the Report, to be
appropriate to meet the requirement of Section 475 of the Local
Government Act.
3.
A Bylaw be introduced to partially discharge Land Use Contract (LUC) 342 and
rezone the subject site from "Highway Commercial Industrial Zone (CHI)" to
"Comprehensive Development Zone (CD)" and a date be set for Public Hearing.
4.
Council authorize staff to draft Development Permit No. 7922-0377-00
generally in accordance with the attached drawings (Appendix I).
5.
Council instruct staff to resolve the following issues prior to final adoption:
(a)
ensure that all engineering requirements and issues including
restrictive covenants, dedications, and rights-of-way where necessary,
are addressed to the satisfaction of the General Manager, Engineering;
(b)
submission of a road dedication plan to the satisfaction of the
Approving Officer;
(c)
resolution of all urban design issues to the satisfaction of the
Planning and Development Department;
非商业公共资料研究与事实报道;仅展示核对事实所需的已评估摘录及本站中文说明。版权归原作者或发布机构;不表示来源机构认可本站。原文、来源及使用条款见链接。 来源使用条款 ↗
打开官方 PDF ↗版本与字符定位
留存文件 SHA-256:5a9e0efd4236b7616e1bd9f5845e0c7fa9c7058700075c448980a5d004da8965
文本 SHA-256:18308c969c057c1dd34b078699de80c914bea17f8e54a38d4b6f9c6725187ac5
抽取:pymupdf-1.26.7-text-pages-v1
第 25–25 页;字符 47166–49472(末端不含)