DRAINAGE CANAL BANK FAILURE REPAIRS – 12506 VICKERS WAY
这段原文取自本站留存的同一份 PDF,仅展示本条相关文本;官方在线版本可能更新。
In recent months, the condition of the canal bank has deteriorated and is now in urgent need of
repair. The area is now closed to the public to ensure safety. The proposed repair work will
include the installation of sheet piles to stabilize the bank, reconstruction of the bank and
restoration of the pedestrian path and hand railing to allow safe pedestrian passage along this
stretch of Bath Slough canal.