MetroVote 简体中文
公开试运行资料持续补充 · 名单日期见各选举页查看范围 ↗
SURREY · 固定版本 · PDF 第 45 页

Surrey planning report 7922-0211-00

这段原文取自本站留存的同一份 PDF,仅展示本条相关文本;官方在线版本可能更新。

Staff Report to Council Application No.: 7922-0211-00 Planning & Development Report Page 12 Contribution to the Green City Program* $70,950 • The Arborist Assessment states that there are a total of 63 mature trees on the site, excluding Alder and Cottonwood trees. 71 existing trees, approximately 53% of the total trees on the site, are Alder and Cottonwood trees. It was determined that 9 trees can be retained as part of this development proposal. The proposed tree retention was assessed taking into consideration the location of services, building footprints, road dedication and proposed lot grading. • Table 1 includes an additional 12 protected trees that are located within the Green Infrastructure Network Corridor. The trees within the Green Infrastructure Network Corridor will be retained, except where removal is required due to hazardous conditions or regrading requirements. This will be determined at a later time, in consultation with the Parks, Recreation and Culture Department. • For those trees that cannot be retained, the applicant will be required to plant trees on a 1 to 1 replacement ratio for Alder and Cottonwood trees, and a 2 to 1 replacement ratio for all other trees. This will require a total of 161 replacement trees on the site. Since only 32 replacement trees can be accommodated on the site, the deficit of 129 replacement trees will require a cash-in-lieu payment of $70,950 representing $550 per tree to the Green City Program, in accordance with the City’s Tree Protection By-law. • The applicant is proposing to remove a City tree that is within the existing GIN corridor to the east of the site. Prior to final approval, the applicant will work with the City staff to explore retention of this tree. • In addition to the replacement trees, boulevard street trees will be planted on 28 Avenue and 28A Avenue. This will be determined by the Engineering Department during the servicing design review process. • In summary, a total of 41 trees are proposed to be retained or replaced on the site with a contribution of $70,950 to the Green City Program.

非商业公共资料研究与事实报道;仅展示核对事实所需的已评估摘录及本站中文说明。版权归原作者或发布机构;不表示来源机构认可本站。原文、来源及使用条款见链接。 来源使用条款 ↗

打开官方 PDF ↗
版本与字符定位

留存文件 SHA-256:e5846ddac4ea457903aa7c7e04bd16fb0db137e9275e60ef5dbc8d3307a3f6b2

文本 SHA-256:40a15c327c98329058e05b0c492c8bf98ae0ca4cd640757f8ee134bf7a02ebde

抽取:pymupdf-1.26.7-text-pages-v1
第 45–45 页;字符 64188–66355(末端不含)