MetroVote 简体中文
公开试运行资料持续补充 · 名单日期见各选举页查看范围 ↗
SURREY · 固定版本 · PDF 第 2 页

Surrey planning report 7922-0205-00

这段原文取自本站留存的同一份 PDF,仅展示本条相关文本;官方在线版本可能更新。

Staff Report to Council Application No.: 7922-0205-00 Planning & Development Report Page 2 RECOMMENDATION SUMMARY • Approval to draft Development Permit for Form and Character. • Approval for the Development Variance Permit to proceed to Public Notification DEVIATION FROM PLANS, POLICIES OR REGULATIONS • Proposing to vary CD Bylaw No. 16767 in order to reduce the number of required off-street parking spaces from 160 to 95. RATIONALE OF RECOMMENDATION • The proposal complies with the "Park" designation in the City Centre Plan Area. • The proposed additional to the Chuck Bailey Recreation Centre will provide a valuable public amenity to residents in the City Centre community, and more generally for the City of Surrey. • Both the existing partially covered skate park and outdoor hockey/basketball facilities located within Tom Binnie Park to the immediate south of the Chuck Bailey Recreation Centre, not included in the development application, will remain open. • The proposed expansion to the Chuck Bailey Recreation Centre is energy efficient, aligning with the Passive Design target under the Canadian Green Building Council’s Zero Carbon Building energy performance level, and achieves an attractive architectural built form, which utilizes high quality, natural materials, and contemporary lines. • The proposal includes a substantial amount of both passive and active landscaping, including a children’s play area and urban agriculture feature. • As part of the subject development application a parking capacity analysis was undertaken by Steer Group to assess the current parking demand and supply at the Chuck Bailey Recreation Facility as well as future supply requirements based on estimated future demand. The study, which took place in December 2021, found an overall peak demand of approximately 61 parking spaces for the existing Chuck Bailey Recreation Centre. • Based on a linear relationship between the surveyed parking demand and the proposed gross floor area of the expanded Chuck Bailey Recreation Centre the peak demand for off-street parking is projected to increase from approximately 61 to 72 parking spaces. • As the parking capacity analysis found a high demand for accessible parking stalls existed within the existing Chuck Bailey Recreation Centre the proposal includes 7 accessible parking stalls, which exceeds the Zoning Bylaw requirements.

非商业公共资料研究与事实报道;仅展示核对事实所需的已评估摘录及本站中文说明。版权归原作者或发布机构;不表示来源机构认可本站。原文、来源及使用条款见链接。 来源使用条款 ↗

打开官方 PDF ↗
版本与字符定位

留存文件 SHA-256:770a65864ab8a73cd93bd168fe332011ebb583a95dae9a18e7c9d87cd7b089d1

文本 SHA-256:19e6fde712625c9882c7faa065e3dd42835d7f5637be4fcbcbbb0a513016d56c

抽取:pymupdf-1.26.7-text-pages-v1
第 2–2 页;字符 392–2869(末端不含)