Surrey 2023-04-17 市议会土地使用会议
这段原文取自本站留存的同一份 PDF,仅展示本条相关文本;官方在线版本可能更新。
To reduce the minimum streamside setback distance from the top-of-bank for a
"Natural Class A Stream" from 30 metres to 10.8 metres and to reduce the
minimum rear yard setback from 7.5 metres to 5.0 metres to the principal building
face for proposed Lot 1 and 2. The applicant is also seeking to reduce the following
variance for Lot 2: reduce minimum front yard setback for the principal building
from 7.5 metres to 1.8 metres, reduce the minimum lot width from 15 metres to
7.3 metres and reduce the minimum lot depth from 28 metres to 26 metres. In
addition, a reduction to the minimum lot width for proposed Lot 1 from 15 metres
to 12.3 metres.
非商业公共资料研究与事实报道;仅展示核对事实所需的已评估摘录及本站中文说明。版权归原作者或发布机构;不表示来源机构认可本站。原文、来源及使用条款见链接。 来源使用条款 ↗
打开官方 PDF ↗版本与字符定位
留存文件 SHA-256:b0fb2f2c4cb9998f074528984308027efc12f9f0cd40a28bee89fb5e5503eebf
文本 SHA-256:36de426281c0d9ed9cf8d91495d1dda1c5d8bd0e169d5528db31392c1d791d84
抽取:pymupdf-1.26.7-text-pages-v1
第 25–25 页;字符 45985–46641(末端不含)