2023 UTILITY BUDGETS AND RATES
这段原文取自本站留存的同一份 PDF,仅展示本条相关文本;官方在线版本可能更新。
Option 3 (Recommended)
Includes everything in Option 2; and
Includes an additional $1.0M transfer of operations and maintenance to the utility,
bringing the total drainage operations and maintenance funded from the utility to $5.0M.
The remaining drainage operations and maintenance costs will continue to be funded from
the City¶s operating budget.
非商业公共资料研究与事实报道;仅展示核对事实所需的已评估摘录及本站中文说明。版权归原作者或发布机构;不表示来源机构认可本站。原文、来源及使用条款见链接。 来源使用条款 ↗
打开官方 PDF ↗版本与字符定位
留存文件 SHA-256:e723c68175dcfa6bb4fd681c708339427192565a98cef493c6331a77b3d55d29
文本 SHA-256:2a5585fad0f432587575e831bed7fb43590e75c765eb59a7532e2712a0ec0a33
抽取:pymupdf-1.26.7-text-pages-v1
第 29–29 页;字符 60459–60817(末端不含)