TRANSLINK 2023 COST-SHARE FUNDING APPLICATIONS – TRANSPORTATION CAPITAL PROJECTS
这段原文取自本站留存的同一份 PDF,仅展示本条相关文本;官方在线版本可能更新。
Steveston Highway Multi-Use Pathway (No. 2 Road to Railway Avenue): This project will
provide a 750 m expansion of the approved two-way off-street paved 3.0 m wide pathway for
pedestrians and cyclists on the south side of Steveston Highway from Mortfield gate to No. 2
Road (2020 project approved by council). This project is proposed under the 2023 Capital
Plan for Council consideration and will require a 2 year accrual of TransLink funds in the
2023 and 2024 program years to receive maximum available funding.
非商业公共资料研究与事实报道;仅展示核对事实所需的已评估摘录及本站中文说明。版权归原作者或发布机构;不表示来源机构认可本站。原文、来源及使用条款见链接。 来源使用条款 ↗
打开官方 PDF ↗版本与字符定位
留存文件 SHA-256:1435205f8e0c6ce8e138ddf438964d24e2fc6cd072eb0e99dac1d0188bc5ec76
文本 SHA-256:c7cb55a6ceb4837feee63fac66fcf41696e1b8765bf45cdf053475aeb3722fac
抽取:pymupdf-1.26.7-text-pages-v1
第 3–3 页;字符 5848–6367(末端不含)