MetroVote 简体中文
公开试运行资料持续补充 · 名单日期见各选举页查看范围 ↗
SURREY · 固定版本 · PDF 第 5 页

Surrey planning report 7922-0147-00

这段原文取自本站留存的同一份 PDF,仅展示本条相关文本;官方在线版本可能更新。

Staff Report to Council Application No.: 7922-0147-00 Planning & Development Report Page 5 • The proposed 3-year TUP will be valid from the date of approval. A TUP can be extended only once for a further maximum 3-year period subject to Council approval. The applicant is aware of this timeline and has indicated that their plan is to redevelop the property in accordance with the Anniedale-Tynehead NCP (see Appendix III for Future Development Concept). • The applicant has provided a site plan for the proposed truck parking and outdoor storage use that includes the following: o parking spaces for approximately 25 oversized trucks and trailers are proposed within northwest corner of the site; o outdoor storge of metal and rebar is proposed in the centre of the site; o the existing 11-metre wide drive aisle located along the south property line is proposed to be retained to provide access to the site from 177A Street; o the existing vacant school building located at the southwest corner of the site is proposed to be used as office space and washroom facilities for the proposed temporary use; and o landscape screening and fencing is proposed to complement existing trees around the perimeter of the site. • Vehicular access will be from 177A Street in the southeast corner of the site. As noted above, the applicant is required to complete required road pavement widening and upgrades along 177A Street, 97 Avenue, 179 Street, 96 Avenue, and 180 Street to provide truck access (8.0 metres pavement) from the site through to Golden Ears Way at 180 Street (approximately 740 metres of road works). • The subject site has existing intermittent tree buffers along the north (Highway 1) and west (Highway 15) sides, which the applicant proposes to supplement with additional tree and shrub planting and fencing to screen the use from these major roads. • The applicant is proposing to erect an 8 ft. tall black chain link fence with privacy screens along the south lot line to screen the use from existing residential properties to the south. • The applicant has committed to continue to work with staff on the proposed landscaping and fencing details to ensure appropriate buffering as a condition of TUP issuance (should Council support the proposed temporary use). The landscaping and fencing will be required to be installed and inspected prior to TUP issuance and securities would be collected to ensure the landscaping and fencing is maintained over the course of the TUP. • The proposed temporary truck parking and outdoor storage use will allow for the interim use of the land until it is economically viable for redevelopment. • The proposed temporary truck parking and outdoor storage use will assist in providing much- needed authorized truck parking spaces and outdoor storage space in the City. Referrals Engineering: The Engineering Department has no objection to the project subject to the completion of Engineering servicing requirements as outlined in Appendix II.

非商业公共资料研究与事实报道;仅展示核对事实所需的已评估摘录及本站中文说明。版权归原作者或发布机构;不表示来源机构认可本站。原文、来源及使用条款见链接。 来源使用条款 ↗

打开官方 PDF ↗
版本与字符定位

留存文件 SHA-256:9328ae53f2f926989b02a3f49bdff24f1fd45a42b3869b1f7c5c6e4d688ce604

文本 SHA-256:bf154a89f3cbacd29ad4bd2a0637c383b02b14d6b59b7f7db35500dea9f0b912

抽取:pymupdf-1.26.7-text-pages-v1
第 5–5 页;字符 6768–9844(末端不含)