North Dike Upgrades from Lynas Lane to No. 2 Road – Public Engagement Summary
这段原文取自本站留存的同一份 PDF,仅展示本条相关文本;官方在线版本可能更新。
Construction Impacts
While the exact details of the project’s construction including equipment being used, hours of
work, duration of construction, and methodologyofconstruction cannot be confirmed until a
contractor is hired, the City has identified potential measures that can be used to mitigate the
impacts on residents. These measures, along with other information about what to expect during
construction, were shared with residents through the 2026 public engagements. In addition to
these measures, the City will look to have contractors submit information on how they will
minimize disruption to nearby residents as part of the request for proposal process.
Residents’ concerns have focused on the access to local residential buildings and amenities, and
the potential for property damage during construction including disruption from noise, vibrations
and dust. Prior to construction, staff will develop traffic management and noise and vibration
monitoring plans. As the project reaches the construction stage, staff will remain committed to
engaging with the residents, sharing details about the project construction and working closely
with the community to ensure their questions and concerns are heard throughout construction.
非商业公共资料研究与事实报道;仅展示核对事实所需的已评估摘录及本站中文说明。版权归原作者或发布机构;不表示来源机构认可本站。原文、来源及使用条款见链接。 来源使用条款 ↗
打开官方 PDF ↗版本与字符定位
留存文件 SHA-256:e39936e0e2f98d66fe6da6153f1970762060f65b2261879b78ecc53867e9a6ad
文本 SHA-256:86ad83069af410b9b1c08f0de9b1bfe5248dd2097d220dc910b02d6262a3fea5
抽取:pymupdf-1.26.7-native-footer-ocr150-eng-7d4322bd2a774972-v1
第 12–12 页;字符 25851–27092(末端不含)