OPTIONS FOR SNOW REMOVAL FROM PRIORITY PEDESTRIAN CORRIDORS — REFERRAL RESPONSE
这段原文取自本站留存的同一份 PDF,仅展示本条相关文本;官方在线版本可能更新。
snow back onto the aiierial roads would be avoided and the practise is assured not to create
hazards for either cyclists or vehicular travellers.
Delineated bike lanes would not be included at this time given they are too narrow for existing
equipment to service. Staff are, however, evaluating opportunities to add plow capability as part
of a new, narrower street sweeper being acquired for cleaning delineated bike lanes. Given
acquisition process requirements and current supply chain challenges, the new mini sweeper is
not expected to be in service for six to nine months.
Key Pedestrian Pathways: Pedestrian pathways are a City asset not captured by Bylaw 5870, nor
do they generally abut residences or businesses. To facilitate clearing key pathway routes, staff
propose to conduct a pilot initiative during the 2022/2023 winter season to clear snow and assess
environmental impacts from the Railway Greenway MUP and the Alderbridge Way MUP. These
pathways totalling five kilometres in length, see high pedestrian and cyclist traffic throughout the
year and clearing them after a snow event will provide a safe passage for pedestrians and cyclists
alike along this route.
A target timeline completion objective of 72 hours after the end of the snowfall event will be
established for this pilot. A one-tonne (F-550) trnck, which is already a part of the City's fleet
inventory, outfitted with a plow and a brine unit will be used to provide this service. The results
of this pilot can then be evaluated for functionality, accessibility, usage and environmental
impacts as paii of establishing any cost requirements for select application to additional
pathways in the future.
Financial Impact
The pilot initiatives identified in this rep01i are proposed to be funded from within existing
funding levels. Any future funding requirements associated with fonnalizing or expanding this
service level would be identified as part of standard budget approval processes.
非商业公共资料研究与事实报道;仅展示核对事实所需的已评估摘录及本站中文说明。版权归原作者或发布机构;不表示来源机构认可本站。原文、来源及使用条款见链接。 来源使用条款 ↗
打开官方 PDF ↗版本与字符定位
留存文件 SHA-256:a9c789bd91cc10d9061542fa406ec72d3add2b603adb216850774f7a8b6b6540
文本 SHA-256:d0cfc6e007a16b03ec13ec89566d850a9354349d9eeca06c2e23ef75e20288c9
抽取:pymupdf-1.26.7-text-pages-v1
第 6–6 页;字符 13598–15590(末端不含)