MetroVote 简体中文
公开试运行资料持续补充 · 名单日期见各选举页查看范围 ↗
SURREY · 固定版本 · PDF 第 12 页

Surrey 2024-05-06 市议会公开听证会议

这段原文取自本站留存的同一份 PDF,仅展示本条相关文本;官方在线版本可能更新。

It was Moved by Councillor Kooner Seconded by Councillor Elford That Council: 1. Authorize the Mayor to execute the funding agreement for $5,000,000.00 with BC Hydro for the Surrey City Energy’s Sewer Heat Recovery Project; 2. Award Contract No. 5524-003 to Kerr Wood Leidal Associates Ltd. in the amount of $3,998,975 (including GST) for the design of the Sewer Heat Recovery Project; 3. Set the expenditure authorization limit for Contract No. 5524-003 at $4,400,000 (including contingencies and GST); 4. Authorize the General Manager, Engineering to execute Contract No. 5524-003; and 5. Authorize the General Manager, Engineering to award and execute a Consultant Construction Agreement with Kerr Wood Leidal Associated Ltd. for the optional construction services at an estimated fee of $1,910,000 (including contingencies and GST) for the Sewer Heat Recovery Facility, should the optional construction services to retain Kerr Wood Leidal Associates Ltd. be undertaken. RES.R24-918 Carried

非商业公共资料研究与事实报道;仅展示核对事实所需的已评估摘录及本站中文说明。版权归原作者或发布机构;不表示来源机构认可本站。原文、来源及使用条款见链接。 来源使用条款 ↗

打开官方 PDF ↗
版本与字符定位

留存文件 SHA-256:9e87c344a4926f3dc24b737429af38f609b2f1492b501519a1aa94b92713bb07

文本 SHA-256:d9c6b7919e5be39650030c01e4e0cd50749c081ed1a15ca7a5a6f111264f83b3

抽取:pymupdf-1.26.7-text-pages-v1
第 12–12 页;字符 21982–23011(末端不含)