REFERRAL RESPONSE CONSTRUCTION SIGNAGE
这段原文取自本站留存的同一份 PDF,仅展示本条相关文本;官方在线版本可能更新。
In response to this referral, staff propose that the following amendments be considered to the
current sign configuration and content:
1. Change the sign's title block, removing the specific reference to "noise" in order to allow
for a broader context of reportable concerns.
2. Increase the size of the displayed contact phone numbers for added prominence.
3. Increase the minimum sign dimensions to enable the inse1iion of a QR Code that directs
persons to the "Rep01i a Problem" page of the City website, thereby offering the
possibility ofrep01iing a wider range of problems conveniently from a mobile device.
4. Ensure the constructor's contact has 24-hour operability.
非商业公共资料研究与事实报道;仅展示核对事实所需的已评估摘录及本站中文说明。版权归原作者或发布机构;不表示来源机构认可本站。原文、来源及使用条款见链接。 来源使用条款 ↗
打开官方 PDF ↗版本与字符定位
留存文件 SHA-256:e88687a6b733142e32fd826c1a6728ae9fed300be9998826722789ac32d226cd
文本 SHA-256:714ce9a951c422938d402abd9fa4b986890dfbe5a568de201c6d01f11cd69565
抽取:pymupdf-1.26.7-text-pages-v1
第 3–3 页;字符 3451–4133(末端不含)