2023 ZERO CARBON STEP CODE AND BC ENERGY STEP CODE REQUIREMENTS FOR NEW BUILDINGS
这段原文取自本站留存的同一份 PDF,仅展示本条相关文本;官方在线版本可能更新。
While GHG emission intensity limits may vary slightly between building occupancies, the
overall mechanical system implications at each ZCSC level are the same:
•
EL-1 only requires measurement and reporting of a building's modelled GHG emissions.
•
EL-2 can be achieved through electrification of either the domestic hot water system or the
space heating system within the building.
•
EL-3 requires electrification of both space heating and domestic hot water systems.
•
EL-4 is the most stringent level, reflecting very low GHG emission intensities that can be
achieved in an all-electric building connected to BC's electrical grid.
非商业公共资料研究与事实报道;仅展示核对事实所需的已评估摘录及本站中文说明。版权归原作者或发布机构;不表示来源机构认可本站。原文、来源及使用条款见链接。 来源使用条款 ↗
打开官方 PDF ↗版本与字符定位
留存文件 SHA-256:3cfdc4b2eb4996a60b9e2dc974fe712ca981c5682cb1845f87740b01c2e3b698
文本 SHA-256:034c07cc717e8d31c2cd43dcc7284ff78d02aa3578deb6d9d802fd6b514e9f76
抽取:pymupdf-1.26.7-text-pages-v1
第 3–3 页;字符 6220–6864(末端不含)