MetroVote 简体中文
公开试运行资料持续补充 · 名单日期见各选举页查看范围 ↗
SURREY · 固定版本 · PDF 第 4 页

Surrey planning report 7922-0126-00

这段原文取自本站留存的同一份 PDF,仅展示本条相关文本;官方在线版本可能更新。

Staff Report to Council Application No.: 7922-0126-00 Planning & Development Report Page 4 RECOMMENDATION 1. Council endorse the Public Notification to proceed for a By-law to rezone the subject site from "General Agriculture Zone (A-1)" to "Multiple Residential 30 Zone (RM-30)". 2. Council authorize staff to draft Development Permit No. 7922-0126-00 generally in accordance with the attached drawings (Appendix I) and the finalized geotechnical report. 3. Council approve Development Variance Permit No. 7922-0126-00(Appendix VI) varying the following, to proceed to Public Notification: (a) to reduce the minimum rear (west) yard setback of the RM-30 Zone from 6.0 metres to 3.0 metres to the principal building face; (b) to reduce the minimum front (east) yard setback of the RM-30 Zone from 4.5 metres to 3.0 metres to the principal building face for Buildings 2 and 4; (c) to increase the maximum percentage of back-to-back units from 20% to 21% in the “Multiple Residential Zone (30) Zone (RM-30)” (d) to reduce the minimum indoor amenity space required before cash-in-lieu may be applied for a 29-unit townhouse development under Section B.6(b) of Part 4, “General Provisions" of the Surrey Zoning By-law from 74 square metres to 0 square metres. 4. Council approve the applicant's request to reduce the amount of required outdoor amenity space from 105 square metres to 89 square metres. 5. Council instruct staff to resolve the following issues prior to final adoption: (a) ensure that all engineering requirements and issues including restrictive covenants, dedications, and rights-of-way where necessary, are addressed to the satisfaction of the General Manager, Engineering; (b) submission of a subdivision layout to the satisfaction of the Approving Officer; (c) approval from the Ministry of Transportation & Infrastructure; (d) resolution of all urban design issues to the satisfaction of the Planning and Development Department including retaining walls, and site grading; (e) submission of a finalized landscaping plan and landscaping cost estimate to the specifications and satisfaction of the Planning and Development Department; (f) submission of a finalized tree survey and a statement regarding tree preservation to the satisfaction of the City Landscape Architect; (g) the applicant satisfy the deficiency in tree replacement on the site, to the satisfaction of the Planning and Development Department;

非商业公共资料研究与事实报道;仅展示核对事实所需的已评估摘录及本站中文说明。版权归原作者或发布机构;不表示来源机构认可本站。原文、来源及使用条款见链接。 来源使用条款 ↗

打开官方 PDF ↗
版本与字符定位

留存文件 SHA-256:f4fc71307ec3fd2f71af86c33bc0c1d1f29004e3ee96f430d5b808109534d542

文本 SHA-256:951f07284c4fb58c90c6d8da9ef6cd5cb53fc3dcfed25cfdfc2e916d6f095f82

抽取:pymupdf-1.26.7-text-pages-v1
第 4–4 页;字符 4332–6857(末端不含)