MetroVote 简体中文
公开试运行资料持续补充 · 名单日期见各选举页查看范围 ↗
SURREY · 固定版本 · PDF 第 6 页

Surrey 7923-0072-00 May 1 2023 TUP planning report

这段原文取自本站留存的同一份 PDF,仅展示本条相关文本;官方在线版本可能更新。

Staff Report to Council Application No.: 7923-0072-00 Planning & Development Report Page 6  The proposed temporary truck parking and outside storage use will assist in providing much- needed authorized outside storage and truck parking spaces in the City. Referrals Engineering: Fire: The Engineering Department has no objection to the project subject to the completion of Engineering servicing requirements as outlined in Appendix II. A fire safety plan will need to address access, storage, any buildings on site (with fire protection details) and any hazards and ensure that site meets the BC Building Code for access and signage Parks, Recreation & Culture: No trees or vegetation are to be removed from road right-of-way without pre-approval by Parks. Ministry of Transportation & Infrastructure (MOTI): Comments from MOTI are pending and will need to be addressed as a condition of TUP issuance. Transportation Considerations  As a condition of the TUP and Servicing Agreement, the road network must be upgraded to acceptable standards to access 180 Street from 92 Avenue. The work is expected to be carried out by the subject application.  The 92 Avenue entrance will be designed so trucks will not be able to turn left (to prevent driving east) out of the site. A left-in and right-out restrictive covenant will be registered on title.  Truck access will be from 92 Avenue along the eastern property line. The applicant is required to complete required road pavement widening and upgrades along 92 Avenue from 180 Street to provide truck access (7.0 metres pavement) for approximately 1,500 metres of road works. The applicant states that on average 5 trucks will access the site each day (Monday to Friday) between 8:00 AM and 5:00 PM. Mid-sized forklifts will be used on site to load the trucks. Natural Area Considerations  A Class B (yell0w-coded) ditch is located along the northern property line along Highway No. 1. The ditch is considered a stream under the provincial Riparian Areas Protection Regulations (RAPR).  An assessment of the ditch was also provided to the Ministry of Forests, Lands, Natural Resource Operations & Rural Development Contacts (FLNRORD) who are still reviewing the assessment.  In accordance with Part 7A Streamside Protection setbacks of the Zoning By-law, a Class B (yellow-coded) watercourse requires a minimum streamside setback of 7 metres, as measured

非商业公共资料研究与事实报道;仅展示核对事实所需的已评估摘录及本站中文说明。版权归原作者或发布机构;不表示来源机构认可本站。原文、来源及使用条款见链接。 来源使用条款 ↗

打开官方 PDF ↗
版本与字符定位

留存文件 SHA-256:bcd46ef2d3d87de8058fb47f6026d48868b5c0621073d6a4b5ab61bf322926a0

文本 SHA-256:a3e6c1aee2345497c5a7a7c6ba623365b06388456224a6ffced0c2d5e28c3852

抽取:pymupdf-1.26.7-text-pages-v1
第 6–6 页;字符 9487–11930(末端不含)