The City's response continued on an as-required basis since the November 29, 2022 event with
pre-treatment or brining continuing at various times based on conditions per normal operating
practice. Commencing Sunday, December 18, 2022, the City's full response fleet began
operating 24 hours per day to treat roads. Multiple staff teams were established to clear bus
stops, sidewalk letdowns, parking lots as well as walkways, ramps and entrances at City
facilities. During the December 18th week event, there were some traffic backlogs at the George
Massey Tunnel and Alex Fraser Bridge caused by the counter flow lanes not being activated.
The City's December 18th response level continued until weather conditions eased. The
operational response then transitioned to drainage activities to clear catch basins, and to clear
pump station and canal screens to avoid and/or mitigate the impacts of localized flooding caused
by the snow melt. This was further complicated by freezing rain and heavy rain conditions.
非商业公共资料研究与事实报道;仅展示核对事实所需的已评估摘录及本站中文说明。版权归原作者或发布机构;不表示来源机构认可本站。原文、来源及使用条款见链接。 来源使用条款 ↗
打开官方 PDF ↗版本与字符定位
留存文件 SHA-256:f37f5185f75582ea517b6070ea3839a6c1420a0b4ee62a9bc63a7063eea3af09
文本 SHA-256:6273c00ca95bfcb94335475c3796afe1892cb0f04f997c2a2d0acce1a469154a
抽取:pymupdf-1.26.7-text-pages-v1
第 3–3 页;字符 6335–7357(末端不含)