Option 2 would direct staff to review the existing policy and bring forward proposed revisions with cost sharing and cost recovery options for sidewalk improvement projects prior to the 2027 budget process. Option 3: Submit 2027 Capital Submission (recommended) The option includes a capital submission for the design and construction of a pedestrian facility with street lighting on Minler Road as part of the 2027 capital budget process for Council consideration. The estimated cost for this facility is $1.8M with funding currently proposed to comeofthe Capital Reserve (Revolving Fund). The capital submission would be ranked and evaluated with other competing capital submissions and City priorities. Budgetary Implications Should Council endorse Option 3, a capital submission in the amount of$1.8M to design and construct an asphalt walkway on one side of Minler Road (as presented in Option 3 of Attachment 1) will be submitted for Council consideration in the 2027 capital budget process. A corresponding Operational Budget Impact (OBI) increase for the maintenance of the walkway, associated drainage and lighting infrastructure will be included.

非商业公共资料研究与事实报道;仅展示核对事实所需的已评估摘录及本站中文说明。版权归原作者或发布机构;不表示来源机构认可本站。原文、来源及使用条款见链接。 来源使用条款 ↗

打开官方 PDF ↗
版本与字符定位

留存文件 SHA-256:fdc2156eceb850edb033ce277f5c4ef6c44bd1ea73103d77d15dff09d7bb76d0

文本 SHA-256:3b30949f094c9c865014ec44fc3e890d00a26a5c2512fb197c42b73b5dfcd274

抽取:pymupdf-1.26.7-native-footer-ocr150-eng-7d4322bd2a774972-v1
第 7–7 页;字符 14212–15368(末端不含)