Recovered Bird Road RZ21-938041 report via official March17 Planning minutes
这段原文取自本站留存的同一份 PDF,仅展示本条相关文本;官方在线版本可能更新。
Prior to subdivision approval, the applicant must enter into a servicing agreement for the design
and construction of the required site servicing and frontage improvements as described in
Attachment 6, including but not limited to:
•
A new concrete sidewalk, boulevard and curb along the property frontage.
•
Removal of existing driveways and construction of new driveway crossings.
•
New water, storm and sanitary service connections.
Complete details of the site servicing and frontage improvements required for this application are
included in the rezoning considerations in Attachment 6.
非商业公共资料研究与事实报道;仅展示核对事实所需的已评估摘录及本站中文说明。版权归原作者或发布机构;不表示来源机构认可本站。原文、来源及使用条款见链接。 来源使用条款 ↗
打开官方 PDF ↗版本与字符定位
留存文件 SHA-256:64c0609e23e170d96ab5456c729638f12b203155ef2226254a365c690d2a92c6
文本 SHA-256:8cd0b05cc65737a3a6aa5392289817a3da757f83ed921e72e582578f4cbbbbb6
抽取:pymupdf-1.26.7-text-pages-v1
第 5–5 页;字符 9219–9820(末端不含)