MetroVote 简体中文
公开试运行资料持续补充 · 名单日期见各选举页查看范围 ↗
RICHMOND · 固定版本 · PDF 第 5 页

Recovered Bird Road RZ21-938041 report via official March17 Planning minutes

这段原文取自本站留存的同一份 PDF,仅展示本条相关文本;官方在线版本可能更新。

Prior to subdivision approval, the applicant must enter into a servicing agreement for the design and construction of the required site servicing and frontage improvements as described in Attachment 6, including but not limited to: • A new concrete sidewalk, boulevard and curb along the property frontage. • Removal of existing driveways and construction of new driveway crossings. • New water, storm and sanitary service connections. Complete details of the site servicing and frontage improvements required for this application are included in the rezoning considerations in Attachment 6.

非商业公共资料研究与事实报道;仅展示核对事实所需的已评估摘录及本站中文说明。版权归原作者或发布机构;不表示来源机构认可本站。原文、来源及使用条款见链接。 来源使用条款 ↗

打开官方 PDF ↗
版本与字符定位

留存文件 SHA-256:64c0609e23e170d96ab5456c729638f12b203155ef2226254a365c690d2a92c6

文本 SHA-256:8cd0b05cc65737a3a6aa5392289817a3da757f83ed921e72e582578f4cbbbbb6

抽取:pymupdf-1.26.7-text-pages-v1
第 5–5 页;字符 9219–9820(末端不含)