2.
Delegate authority to the City Manager, until August 30, 2024, to increase the
expenditure authorization limit for Contract No. 1220-030-2021-046 with Graham
Construction and Engineering LP for site preparations for the third sheet at the
new Cloverdale Sport & Ice Complex, subject to the following conditions being
satisfied:
a.
Graham Construction and Engineering LP receives at least three quotations
for the work;
b.
The increased expenditure authorization limit is based on the lowest
quotation that fully satisfies the specifications for the site preparation
works; and
c.
Council is informed in a timely manner of the quotations received, the
results of the evaluation of the quotations, and the proponent which has
been selected to carry out the site preparation works; and
3.
Delegate authority to the City Manager, until August 30, 2024, to award Contract
No. 4824-027-11 for the Fry’s Corner Drainage Pump Station Improvements, subject
to the following criteria being satisfied:
a.
The contract is awarded to the contractor submitting the lowest bid, which
fully meets the contract specifications;
b.
The contract award is within the funding available in the 2024 Engineering
Drainage Utilities Budget and within the engineer’s estimate; and
c.
Council is informed in a timely manner of the submissions received, the
results of the evaluation of the submissions, and the contractor which has
been selected to carry out the improvements.
RES.R24-1550
Carried
非商业公共资料研究与事实报道;仅展示核对事实所需的已评估摘录及本站中文说明。版权归原作者或发布机构;不表示来源机构认可本站。原文、来源及使用条款见链接。 来源使用条款 ↗
打开官方 PDF ↗版本与字符定位
留存文件 SHA-256:57a0cad51d4d412f80755109b66d4045027e6692234513b8a3577e3c81cf11c8
文本 SHA-256:9e052886106ab5bc693be05655b8668c374c035f6d97eeb926487869b50eaa90
抽取:pymupdf-1.26.7-text-pages-v1
第 16–16 页;字符 29590–31108(末端不含)