MetroVote 简体中文
公开试运行资料持续补充 · 名单日期见各选举页查看范围 ↗
SURREY · 固定版本 · PDF 第 16 页

Surrey 2024-07-22 市议会公开听证会议

这段原文取自本站留存的同一份 PDF,仅展示本条相关文本;官方在线版本可能更新。

2. Delegate authority to the City Manager, until August 30, 2024, to increase the expenditure authorization limit for Contract No. 1220-030-2021-046 with Graham Construction and Engineering LP for site preparations for the third sheet at the new Cloverdale Sport & Ice Complex, subject to the following conditions being satisfied: a. Graham Construction and Engineering LP receives at least three quotations for the work; b. The increased expenditure authorization limit is based on the lowest quotation that fully satisfies the specifications for the site preparation works; and c. Council is informed in a timely manner of the quotations received, the results of the evaluation of the quotations, and the proponent which has been selected to carry out the site preparation works; and 3. Delegate authority to the City Manager, until August 30, 2024, to award Contract No. 4824-027-11 for the Fry’s Corner Drainage Pump Station Improvements, subject to the following criteria being satisfied: a. The contract is awarded to the contractor submitting the lowest bid, which fully meets the contract specifications; b. The contract award is within the funding available in the 2024 Engineering Drainage Utilities Budget and within the engineer’s estimate; and c. Council is informed in a timely manner of the submissions received, the results of the evaluation of the submissions, and the contractor which has been selected to carry out the improvements. RES.R24-1550 Carried

非商业公共资料研究与事实报道;仅展示核对事实所需的已评估摘录及本站中文说明。版权归原作者或发布机构;不表示来源机构认可本站。原文、来源及使用条款见链接。 来源使用条款 ↗

打开官方 PDF ↗
版本与字符定位

留存文件 SHA-256:57a0cad51d4d412f80755109b66d4045027e6692234513b8a3577e3c81cf11c8

文本 SHA-256:9e052886106ab5bc693be05655b8668c374c035f6d97eeb926487869b50eaa90

抽取:pymupdf-1.26.7-text-pages-v1
第 16–16 页;字符 29590–31108(末端不含)