MetroVote 简体中文
公开试运行资料持续补充 · 名单日期见各选举页查看范围 ↗
RICHMOND · 固定版本 · PDF 第 2 页

Chair’s report

这段原文取自本站留存的同一份 PDF,仅展示本条相关文本;官方在线版本可能更新。

The applicant and architect, Salim Narayanan, of IBI Group, landscape architect, Andrew Danielson, of van der Zalm + Associates and environmental consultant, Jeremy Nilson, Keystone Environmental Ltd. provided a brief visual presentation highlighting that:  There is an ESA between Hotel 1 Building (2899 Jow Street) and Office 2 Building (9250 Beckwith Road);  There is a loss of 22 trees associated with the ESA area and corresponding habitat due to water retention in the ESA;  The water retention in the ESA was due to heavy rains and a waterline break in the area;  The revised proposal will provide replacement tree planting at a 3:1 ratio;  The original ESA compensation plan associated with the issued Development Permit DP 18-825006 will be revised to account for the loss of the trees, including measures such as retaining five existing trees that have died as wildlife trees, raising the grades within the ESA to match the grades of the adjacent sites, removing the invasive plants, replanting of 31 new trees in the ESA area and installing shrubs and groundcovers;  A total of 66 trees are proposed to be planted on-site, with 31 trees to be installed within the ESA and 35 trees will be provided in the landscaped areas outside of the ESA;  The proposed revised ESA compensation plan would restore the habitat values that were lost as a result of the loss of 22 trees; and  In addition to the new trees, a portion of the trees previously approved to be planted on the site outside of the ESA will be upsized to provide additional landscape and habitat value.

非商业公共资料研究与事实报道;仅展示核对事实所需的已评估摘录及本站中文说明。版权归原作者或发布机构;不表示来源机构认可本站。原文、来源及使用条款见链接。 来源使用条款 ↗

打开官方 PDF ↗
版本与字符定位

留存文件 SHA-256:2b8f70c543f3202e88789487c0eb1a1d02ef51bc603863111e8e3b66e7191292

文本 SHA-256:794f696326765e87b35f12acad15e4a718e636bd0bb44e16fc3ccbfbfc453b08

抽取:pymupdf-1.26.7-text-pages-v1
第 2–2 页;字符 1262–2863(末端不含)